In today's business world, it is crucial to be able to effectively communicate with others. One way to do this is by using ideation forms. An ideation form is a tool that helps you capture and organize your ideas. There are many different types of ideation forms, but in this blog post, we will focus on the seven most common ones. Each type has its own advantages and disadvantages, so it's important to choose the right one for your project. Let's take a look at each one!
Question | Answer |
---|---|
Form Name | 7 Idse Form |
Form Length | 9 pages |
Fillable? | No |
Fillable fields | 0 |
Avg. time to fill out | 2 min 15 sec |
Other names | idse form get, 7 idse download, form idse online, idse standard |
Form 7: IDSE Report for Standard Monitoring Page 1 of 9
I. GENERAL INFORMATION
A. PWS Information* |
B. Date Submitted* _______ |
PWSID:
PWS Name:
PWS Address:
City:State: Zip:
Population Served:
|
System Type: |
Source Water Type: |
Buying / Selling Relationships: |
|||
|
|
|
|
|
|
|
|
。 CWS |
。 Subpart H |
|
。 Consecutive System |
||
|
。 NTNCWS |
。 Ground |
|
。 Wholesale System |
||
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
。 Neither |
||
|
|
|
|
|
|
|
|
|
|
|
|
||
C. PWS Operations |
|
|
|
|
||
Residual Disinfectant Type: 。 Chlorine |
。 Chloramines |
。 Other:_____________ |
||||
|
|
|
|
|
|
Number of Disinfected Sources: ___ Surface ___GWUDI ____ Ground ___ Purchased
D. Contact Person*
Name:
Title:
Phone #: |
|
Fax #: |
|
|
|
II. STAGE 2 DBPR REQUIREMENTS*
A.Number of Compliance Monitoring Sites
Highest TTHM:
B. Schedule C. Compliance Monitoring Frequency
。Schedule 1 。 During peak historical month
Highest HAA5:
。 Schedule 2
(1 monitoring period)
Existing Stage 1:
Total:
。 Schedule 3 |
。 Every 90 days (4 monitoring periods) |
|
|
。 Schedule 4
IDSE Guidance Manual for the Final Stage 2 DBPR |
January 2006 |
Form 7: IDSE Report for Standard Monitoring Page 2 of 9
III. MONITORING RESULTS*
A. Did you deviate in any way from your approved standard |
。 Yes |
。 No |
|
|
monitoring plan? |
|
|
|
If YES, explain (attach additional pages if necessary): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B.Where were your TTHM and HAA5 samples analyzed?
。
Is your |
。 Yes |
。 No |
。 Certified Laboratory Name of certified laboratory:
C.What method(s) was used to analyze your TTHM and HAA5 samples?
TTHM |
HAA5 |
。 EPA 502.2 |
。 EPA 552.1 |
。 EPA 524.2 |
。 EPA 552.2 |
。 EPA 551.1 |
。 EPA 552.3 |
|
。 SM 6251 B |
|
|
IDSE Guidance Manual for the Final Stage 2 DBPR |
January 2006 |
Form 7: IDSE Report for Standard Monitoring |
Page 3 of 9 |
|
|
III. MONITORING RESULTS (Continued)*
D. IDSE Standard Monitoring Results - TTHM
Site ID1 |
Data Type |
TTHM (mg/L) |
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
LRAA
1Verify that site IDs for IDSE standard monitoring sites match the site IDs in your Standard Monitoring Plan. Attach additional sheets as needed for IDSE standard monitoring results.
IDSE Guidance Manual for the Final Stage 2 DBPR |
January 2006 |
Form 7: IDSE Report for Standard Monitoring |
Page 4 of 9 |
|
|
III. MONITORING RESULTS (Continued)*
E. IDSE Standard Monitoring Results - HAA5
Site ID1 |
Data Type |
HAA5 (mg/L) |
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
LRAA
1Verify that site IDs for IDSE standard monitoring sites match the site IDs in your Standard Monitoring Plan. Attach additional sheets as needed for IDSE standard monitoring results.
IDSE Guidance Manual for the Final Stage 2 DBPR |
January 2006 |
Form 7: IDSE Report for Standard Monitoring |
Page 5 of 9 |
|
|
III. MONITORING RESULTS (Continued)*
F. Stage 1 DBPR Compliance Monitoring Results - TTHM
Site ID1 |
Data Type |
TTHM (mg/L) |
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
LRAA
1Verify that site IDs for Stage 1 compliance monitoring sites match the site IDs in your Standard Monitoring Plan. Attach additional sheets as needed for Stage 1 compliance monitoring results.
IDSE Guidance Manual for the Final Stage 2 DBPR |
January 2006 |
Form 7: IDSE Report for Standard Monitoring |
Page 6 of 9 |
|
|
III. MONITORING RESULTS (Continued)*
G. Stage 1 DBPR Compliance Monitoring Results - HAA5
Site ID1 |
Data Type |
HAA5 (mg/L) |
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
Sample Date
Sample Result
LRAA
1Verify that site IDs for Stage 1 compliance monitoring sites match the site IDs in your Standard Monitoring Plan. Attach additional sheets as needed for Stage 1 compliance monitoring results.
IDSE Guidance Manual for the Final Stage 2 DBPR |
January 2006 |
Form 7: IDSE Report for Standard Monitoring Page 7 of 9
IV. JUSTIFICATION OF STAGE 2 DBPR COMPLIANCE MONITORING SITES*
Stage 2 |
Site Type |
Justification |
Compliance |
|
|
Monitoring |
|
|
Site ID |
|
|
|
|
|
|
。 Highest TTHM |
|
|
。 Highest HAA5 |
|
|
。 Stage 1 DBPR |
|
|
|
|
|
。 Highest TTHM |
|
|
。 Highest HAA5 |
|
|
。 Stage 1 DBPR |
|
|
|
|
|
。 Highest TTHM |
|
|
。 Highest HAA5 |
|
|
。 Stage 1 DBPR |
|
|
|
|
|
。 Highest TTHM |
|
|
。 Highest HAA5 |
|
|
。 Stage 1 DBPR |
|
|
|
|
|
。 Highest TTHM |
|
|
。 Highest HAA5 |
|
|
。 Stage 1 DBPR |
|
|
|
|
|
。 Highest TTHM |
|
|
。 Highest HAA5 |
|
|
。 Stage 1 DBPR |
|
|
|
|
|
。 Highest TTHM |
|
|
。 Highest HAA5 |
|
|
。 Stage 1 DBPR |
|
|
|
|
|
。 Highest TTHM |
|
|
。 Highest HAA5 |
|
|
。 Stage 1 DBPR |
|
|
|
|
Attach additional copies of this sheet if you need more room.
IDSE Guidance Manual for the Final Stage 2 DBPR |
January 2006 |
Form 7: IDSE Report for Standard Monitoring Page 8 of 9
V.PEAK HISTORICAL MONTH AND PROPOSED STAGE 2 DBPR COMPLIANCE MONITORING SCHEDULE
A.Peak Historical Month*
B.Is Your Peak Historical Month the Same as in Your IDSE Standard Monitoring Plan?
。 Yes |
。 No |
If no, explain how you selected your new peak historical month (attach additional sheets if needed)
C.Proposed Stage 2 DBPR Compliance Monitoring Schedule*
Stage 2
Compliance
Monitoring
Site ID
Projected Sampling Date (date or week)1
period 1 |
period 2 |
period 3 |
period 4 |
|
|
|
|
1period = monitoring period. Complete for the number of monitoring periods from Section II.C.
Attach additional copies of this sheet if you need more room.
IDSE Guidance Manual for the Final Stage 2 DBPR |
January 2006 |
Form 7: IDSE Report for Standard Monitoring Page 9 of 9
VI. DISTRIBUTION SYSTEM SCHEMATIC*
ATTACH a schematic of your distribution system if it has changed since you submitted your Standard Monitoring Plan (Form 6).
VII. ATTACHMENTS
。Additional sheets for explaining how and why you deviated from your standard monitoring plan (Section III).
。Additional sheets for Standard Monitoring Results (Section III). REQUIRED if you are a subpart H system serving more than 49,999 people or a ground water system serving more than 499,999 people.
。Additional sheets for Stage 2 DBPR Compliance Monitoring Sites (Section IV). REQUIRED if you are a subpart H system serving more than 249,999 people.
。Additional sheets for explaining how you selected the peak historical month (Section V).
。Additional sheets for proposed Stage 2 DBPR peak historical month and compliance monitoring schedule (Section V). REQUIRED if you are a subpart H system serving more than 249,999 people.
。Distribution system schematic* (Section VI). REQUIRED if it has changed from your approved IDSE standard monitoring plan.
。Compliance calculation procedures (for Stage 2 Compliance Monitoring Plan).
Total Number of Pages in Your Report: ______
Note: Fields with an asterisk (*) are required by the Stage 2 DBPR
IDSE Guidance Manual for the Final Stage 2 DBPR |
January 2006 |