Form Tceq 00784 PDF Details

The TCEQ 00784 form is used to apply for a Permit by Rule (PBR) under the Texas Clean Air Act. A PBR allows an entity to operate outside of specific air quality regulations, as long as they meet certain requirements. This form can be used by businesses, government entities, or individuals wishing to obtain a PBR. The deadline to submit this form is typically 45 days before the proposed operation begins. The TCEQ 00784 form must be filled out completely and accurately in order to be processed. Incomplete or inaccurate submissions may delay or even prevent the issuance of a permit. Be sure to include all required information, including contact information for the person responsible for monitoring emissions from the facility. If you have any questions about this process, contact your local TCEQ office for assistance.

QuestionAnswer
Form NameForm Tceq 00784
Form Length2 pages
Fillable?No
Fillable fields0
Avg. time to fill out30 sec
Other namestceq 00784 tceq 00784 form

Form Preview Example

Texas Commission on Environmental Quality

P2 Annual Progress Report

Required APR

Form

PART 1. FACILITY DESCRIPTION

Report Year:

 

Report Date:

 

 

 

Company Name:

 

 

 

 

 

Facility Name:

 

 

 

 

 

Mailing Address:

 

Physical Address:

 

 

 

Mailing City, State, Zip:

 

Physical City, State, Zip:

 

 

 

Name of Pollution Prevention Contact:

 

TCEQ SW Reg. #

 

 

 

Telephone:

 

TRI ID #

 

 

 

Fax:

 

EPA ID #

 

 

 

E-mail (optional):

 

NAICS:

 

 

 

Primary SIC Code:

 

Number of Employees:

 

 

 

Secondary SIC Code:

 

Independently owned? Yes No

 

 

 

First year of your current plan:

 

 

 

 

Does this report revise a previously submitted APR? Yes

No

 

 

 

PART 2. PROJECTED AMOUNTS FOR GOAL YEAR (FROM YOUR PLAN)

Goal Year (the fifth year of your plan): ____________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Estimate Quantity

 

 

 

 

 

 

 

 

 

 

 

HW (A)

 

 

TRI (B)

 

 

 

 

 

 

 

1.

Projected amount of HW generation or

 

Tons

 

Tons

 

TRI releases/transfers by Goal Year

 

 

 

 

 

 

 

 

 

 

 

2.

Source reduction anticipated over five-year period

 

Tons

 

Tons

 

 

 

 

 

 

 

3.

% Waste Minimization by the Goal Year

 

%

 

%

 

 

 

 

 

 

 

TCEQ-00784 (11/10)

1

Facility Name: ___________________________________________ Date: ______________________________________________

Part 3. Reduction Achievement for the Report Year

Source Reduction Activities

Estimate the amount of reduction for hazardous waste generation and TRI release/transfer that your facility experienced in each category below.

Estimate Quantity

HW (A) [Tons]

TRI (B) [Tons]

1.Good Operating Practices

2.Inventory Control

3.Spill and Leak Prevention

4.Raw Material Modifications

5.Process Modifications

6.Cleaning and Degreasing

7.Surface Preparation and Finishing

8.Product Modification

9.Total Source Reduction (Sum 1-8) in Tons

Briefly describe any modifications to your plan as well as your pollution prevention projects, especially the activity you undertook to reduce waste at it’s source for the report year:

_________________________________________________________________________________________________________

_________________________________________________________________________________________________________

_________________________________________________________________________________________________________

_________________________________________________________________________________________________________

_________________________________________________________________________________________________________

_________________________________________________________________________________________________________

_________________________________________________________________________________________________________

_________________________________________________________________________________________________________

If your project was successful please complete the Optional Case Study Form at the end of this document and send it to us. TCEQ likes to recognize companies who have had great successes.

Note: Submission of waste minimization information and information about HW generated and TRI released and transferred for the previous reporting year is required by the Waste Reduction Policy Act. SQG’s that are non-TRI Form R reporters meet this requirement through submission of their annual waste summary. All hazardous waste generators are required to submit an annual waste summary. Submission of this form does not substitute for submission of the annual waste summary.

TCEQ-00784 (11/10)

2