Form Tceq 20345 PDF Details

As a business owner, you're busy and have a lot on your plate. You may not have time to keep up with the latest changes in environmental regulations, or even know where to start. That's where Form Tceq 20345 comes in. This form is for businesses that want to request a permit for air emissions from their facility. By completing this form, you can get started on the process of obtaining the necessary permit and staying compliant with environmental regulations. Completing this form is the first step towards protecting your business and complying with all applicable laws and regulations.

QuestionAnswer
Form NameForm Tceq 20345
Form Length2 pages
Fillable?No
Fillable fields0
Avg. time to fill out30 sec
Other namesDiam, RCP, Riprap, E-mail

Form Preview Example

Texas Dam Safety Program, MC 174

H y d r o l o g i c a n d H y d r a u l i c G u i d e l i n e s f o r D a m s i n Te x a s

Field Operations Support Division, Office of Compliance and Enforcement

Texas Commission on Environmental Quality

P.O. Box 13087

Austin, TX 78711

INFORMATION SHEET: PROPOSED NEW CONSTRUCTION,

MODIFICATION, REPAIR, ALTERATION, OR REMOVAL OF A DAM

(PLEASE PRINT OR TYPE)

Reference 30 Texas Administrative Code, Chapter 299, Dams and Reservoirs

PLEASE CHECK ONE: New Modification Repair Removal Alteration

SECTION 1: OWNER INFORMATION

Owner’s Name ______________________________________ Title _________________________________________

Organization _____________________________________________________________________________________

I have authorized the submittal of the final construction plans and specifications to the TCEQ Dam Safety Program according to 30 TAC Chapter 299.

________________________________________________________________________________________________

(Signature of Owner)(Date)

Owner’s Address ___________________________________________________________________________________

City _______________________________ State ____________________________ Zip Code ____________________

Phone Number (

) _______________________________ Emergency Contact Phone (

) __________________

Fax Number (

) __________________ E-mail ______________________________________________________

Owner Code (Please check one): Federal (F) Local Government (L) Utility (U) Private (P) State (S)

Other (O) please specify: ___________________________________________________

Dam and Reservoir Use (Please check one):

Augmentation

Diversion

Domestic

Erosion Control

Evaporation

Flood Control

Fire Control

Fish

Hydroelectric

Industrial

Irrigation

Mining

Municipal

Pollution Control

Recreation

Stock Water

Settling Ponds

Tailings

Waste Disposal

Other, please specify: _____________________________

Engineering Firm __________________________________________________________________________________

Project Engineer ________________________________________ Texas P.E. License Number _____________________

Engineering Firm Address ____________________________________________________________________________

City _______________________________ State ____________________________ Zip Code ___________________

Phone ( ) _______________________ Fax ( ) ______________________

E-mail __________________________________________________________________________________________

SECTION 2: GENERAL INFORMATION

Name of Dam ____________________________________________________________________________________

Other Name(s) of Dam ______________________________________________________________________________

Reservoir Name ___________________________________________________________________________________

Location ____________________________ Latitude _________________________ Longitude ___________________

County _____________________________ Stream Name _________________________________________________

River Basin __________________________ Topographic Map No. ___________________________________________

Distance and Direction from Nearest City or Town _________________________________________________________

TX Number _________________________ Water Rights Number ___________________________________________

If you have questions on how to fill out this form or about the Dam Safety Program, please contact us at 512-239-5195.

Individuals are entitled to request and review their personal information that the agency gathers on its forms. They may also

have any errors in their information corrected. To review such information, contact us at 512-239-3282.

T E X A S C O M M I S S I O N O N E N V I R O N M E N T A L Q U A L I T Y

31

TCEQ-20345 (1/07)

 

H y d r o l o g i c a n d H y d r a u l i c G u i d e l i n e s f o r D a m s i n Te x a s

SECTION 3: INFORMATION ON DAM

CLASSIFICATION

 

 

 

Size Classification:

Large

Medium

Small

Hazard Classification:

High

Significant

Low

Number of People at Risk _______________ Study Year

___________________

TYPE OF DAM: Concrete Gravity

Earthfill

Rockfill Masonry Other (specify) _________________

DAM STRUCTURE (dimensions to nearest tenth of foot, volume to nearest acre-foot or cubic yard, areas to nearest acre):

Spillway Height _______________ ft

(natural surface of ground to bottom of emergency spillway at longitudinal centerline)

Embankment Height ___________ ft

(natural surface of ground to crest of dam at centerline)

Structural Height ______________ ft

(bottom of cutoff trench to crest of dam at centerline)

Length of Dam ________________ ft

 

Crest Width __________________________________ ft

Normal Pool Elevation _____________________ ft-MSL

Principal Spillway Elevation __________________ ft-MSL

Emergency Spillway Elevation ________________ ft-MSL

Top of Dam Elevation ______________________ ft-MSL

Embankment Volume _____________________________ cu yd

Maximum Impoundment Capacity ___________________ ac-ft (at top of dam)

Normal Reservoir Capacity _________________________ ac-ft (at normal or conservation pool)

Reservoir Surface Area _____________________________ acres (at normal or conservation pool)

OUTLET

 

 

 

 

 

 

Outlet Diameter: __________________ in

ft (check one)

 

Type: ___________________________

 

 

 

PRINCIPAL SPILLWAY

 

 

 

 

Type:

Natural

Riprap

Concrete

CMP

RCP

Other

Width (Diam.): ___________________ ft

Capacity: ____________________ cfs

EMERGENCY SPILLWAY

 

 

 

 

Type:

Natural

Riprap

Concrete

CMP

RCP

Other

Width (Diam.): ___________________ ft

Capacity:

____________________ cfs

Total Spillway Capacity: ______________________________________________ cfs (crest of the dam)

SECTION 4: HYDROLOGIC INFORMATION

Required Hydrologic Criteria (% PMF) _____________ % PMF Passing ______________________________

PMF Study Year ______________________________

Drainage Area: _______________________________ acres, or ________________________________ sq mi

Curve Number (AMC III condition) _______________

Time of Concentration _________________________ hr

Peak Discharge _______________________________ cfs

 

Peak Stage

__________________________________ ft-MSL

 

Storm Duration Causing Peak Stage _______________ hr

 

 

 

32

 

T E X A S C O M M I S S I O N O N E N V I R O N M E N T A L Q U A L I T Y