Bmp Plan Form PDF Details

The Alabama Department of Environmental Management (ADEM) provides this structured 42-page template for small noncoal and nonmetallic mining operations. Operators use the document to build a comprehensive Best Management Practices plan tailored to their project site. The template aligns with General Permit ALG890000 and draws from the Alabama Handbook for Erosion Control, Sediment Control, and Stormwater Management on Construction Sites and Urban Areas.

What the BMP Plan Covers

The form addresses several areas of environmental compliance. It includes sections for site evaluation, erosion and sediment control measures, stormwater management practices, housekeeping protocols, pollution prevention measures, inspection schedules, recordkeeping, employee training, and final site stabilization. Each section can be customized to reflect the specific conditions and challenges of the operator's project location. For example, an operator working near a waterbody classified as Outstanding Alabama Water (OAW) must document additional protective measures beyond the standard requirements.

Who Needs a BMP Plan

Any operator applying for or holding a Small Noncoal/Nonmetallic Mining General Permit in Alabama must submit a completed plan to ADEM. This applies to quarries, sand and gravel pits, clay operations, and similar surface mining activities that disturb land and may affect water quality. Operators working on construction projects with mining components should also review the stormwater sections of this template. The requirement extends to any mining activity that involves land disturbance, regardless of the total acreage affected.

How to Complete the Template

The document is designed for electronic completion. Operators fill in site-specific information such as project name, location coordinates (latitude and longitude, available through the EPA NPDES stormwater lookup tool), total disturbed acreage, descriptions of receiving water bodies, and planned control measures. The completed plan must be kept on site and updated whenever conditions change, new disturbance areas open, or control measures are modified. ADEM may also require updates tied to the annual permit renewal cycle. Operators should keep copies of all inspection logs, training records, and modification histories alongside the plan document.

QuestionAnswer
Form NameBmp Plan Form
Form Length42 pages
Fillable?No
Fillable fields0
Avg. time to fill out10 min 30 sec
Other namesbmp template, bmp plan alabama, plan bmp get, bmp plans