Bmp Plan Form PDF Details

The Alabama Department of Environmental Management (ADEM) provides this structured 42-page template for small noncoal and nonmetallic mining operations. Operators use the document to build a comprehensive Best Management Practices plan tailored to their project site. The template aligns with General Permit ALG890000 and draws from the Alabama Handbook for Erosion Control, Sediment Control, and Stormwater Management on Construction Sites and Urban Areas.

What the BMP Plan Covers

The form addresses several areas of environmental compliance. It includes sections for site evaluation, erosion and sediment control measures, stormwater management practices, housekeeping protocols, pollution prevention measures, inspection schedules, recordkeeping, employee training, and final site stabilization. Each section can be customized to reflect the specific conditions and challenges of the operator's project location. For example, an operator working near a waterbody classified as Outstanding Alabama Water (OAW) must document additional protective measures beyond the standard requirements.

Who Needs a BMP Plan

Any operator applying for or holding a Small Noncoal/Nonmetallic Mining General Permit in Alabama must submit a completed plan to ADEM. This applies to quarries, sand and gravel pits, clay operations, and similar surface mining activities that disturb land and may affect water quality. Operators working on construction projects with mining components should also review the stormwater sections of this template. The requirement extends to any mining activity that involves land disturbance, regardless of the total acreage affected.

How to Complete the Template

The document is designed for electronic completion. Operators fill in site-specific information such as project name, location coordinates (latitude and longitude, available through the EPA NPDES stormwater lookup tool), total disturbed acreage, descriptions of receiving water bodies, and planned control measures. The completed plan must be kept on site and updated whenever conditions change, new disturbance areas open, or control measures are modified. ADEM may also require updates tied to the annual permit renewal cycle. Operators should keep copies of all inspection logs, training records, and modification histories alongside the plan document.

QuestionAnswer
Form NameBmp Plan Form
Form Length42 pages
Fillable?No
Fillable fields0
Avg. time to fill out10 min 30 sec
Other namesbmp template, bmp plan alabama, plan bmp get, bmp plans

How to Edit Bmp Plan Form Online for Free

You can fill out the BMP plan template directly in your browser using our online PDF editor. No software installation is required. Our editor supports text entry, field modifications, image insertion, and electronic signatures.

Step 1: Click the "Get Form" button at the top of this page to open the document in our PDF editing tool.

Step 2: The 42-page template will load with all fillable areas ready for input. You can type text, adjust existing entries, add graphics, and sign the document electronically.

Complete each section of the template by following the steps below:

1. Start with the cover page and general project information. Enter your project name, site location, total acreage, and contact details in the designated fields:

How one can fill out plan bmp sample step 1

2. Move to the site evaluation section. Fill in the fields for Contents, SECTION, and SITE EVALUATION, including descriptions of your site terrain, soil types, and nearby water bodies. If your site is near a waterbody listed on Alabama's 303(d) impaired waters list, note the specific pollutants of concern.

plan bmp sample conclusion process detailed (stage 2)

Double-check your entries in the site evaluation sections. Errors in these fields are the most common reason ADEM returns plans for revision. Pay close attention to the coordinates and acreage figures, as discrepancies trigger automatic review flags.

3. Complete the erosion and sediment control measures section. List the specific BMPs you will use, such as silt fences, sediment basins, temporary seeding, and check dams. Each measure should include installation timing, maintenance frequency, and removal criteria:

Contents SECTION  SITE EVALUATION, Contents SECTION  SITE EVALUATION, and Contents SECTION  SITE EVALUATION of plan bmp sample

4. Fill in the stormwater management details. Enter the required information for receiving water classifications, latitude and longitude coordinates (available at the EPA NPDES stormwater site), permit requirements, total site area, total disturbed area, and project location data. Include any Total Maximum Daily Load (TMDL) allocations that apply to your discharge points:

Simple tips to fill out plan bmp sample step 4

5. Finish with the water quality and resource protection section. Complete the fields for Resource Waters (ONRW or Treasured), pollutant sources, TMDL requirements, descriptions of receiving waters, storm sewer system details, and OAW/ONRW/TAL classifications. This section is critical for sites near protected water bodies:

The best ways to fill in plan bmp sample stage 5

Step 3: Review all completed fields, then click "Done" to save your work. After creating a free 7-day trial account at FormsPal, you can download or email the finished document as a PDF. Your files will be stored in your account for future access. FormsPal protects your data and does not share personal information with third parties.