Ferc Form 80 PDF Details

Understanding the Federal Energy Regulatory Commission's (FERC) Form 80 is essential for stakeholders involved in licensed hydropower development and the management of recreational amenities within project boundaries. This comprehensive report form serves as a crucial tool for collecting data on the availability and usage of recreational facilities at hydropower projects licensed under the Federal Power Act. By requiring licensees to submit detailed information, including the types of recreation amenities offered, their operating costs and revenues, and the amount of public use, FERC ensures that these resources contribute positively to the surrounding communities. The form, which must be filed periodically, outlines specific instructions for different scenarios, including initial filings for both unconstructed and existing projects. It emphasizes the importance of providing accurate, complete data, highlighting its relevance in the planning and management of recreational facilities within hydropower project boundaries. Moreover, the FERC Form 80 includes a section dedicated to inventorying publicly available amenities, demanding a close examination of user fees, FERC approved amenities, and their capacity utilization to gauge overall use levels. This meticulous approach to data collection and reporting underscores the broader goal of balancing energy production with recreational opportunities, fostering a harmonious coexistence that benefits both the environment and the public.

QuestionAnswer
Form NameFerc Form 80
Form Length3 pages
Fillable?No
Fillable fields0
Avg. time to fill out45 sec
Other namesform 80 pdffiller, fillable form80, form 80 australia online, washington

Form Preview Example

Federal Energy Regulatory

Commission (FERC)

FERC Form 80

Licensed Hydropower Development

Recreation Report

Form Approved OMB No. 1902-0106 Expires: 09/30/2016 Burden 3.0 hours

General Information:

This form collects data on recreation amenities at projects licensed by FERC under the Federal Power Act (16 USC 791a-825r). This form must be submitted by licensees of all projects except those specifically exempted under 18 CFR 8.11 (c). For regular, periodic filings, submit this form on or before April 1, 2015. Submit subsequent filings of this form on or before April 1, every 6th year thereafter (for example, 2021, 2027, etc.). For initial Form No. 80 filings (18CFR 8.11(b)), each licensee of an unconstructed project shall file an initial Form No. 80 after such project has been in operation for a full calendar year prior to the filing deadline. Each licensee of an existing (constructed) project shall file an initial Form No. 80 after such project has been licensed for a full calendar year prior to the filing deadline. Filing electronically is preferred. (See http://www.ferc.gov for more information.) If you cannot file electronically, submit an original and two copies of the form to the: Federal Energy Regulatory Commission, Office of the Secretary, 888 First St., NE, Washington, DC 20426.

The public burden estimated for this form is three hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing the collection of information. Send comments regarding the burden estimate or any aspect of this collection of information, including suggestions for reducing burden, to: FERC via e-mail DataClearance@ferc.gov; or mail to 888 First Street NE, Washington, DC 20426 (Attention: Information Clearance Officer) and Office of Management and Budget (OMB), via e-mail to oira_submission@omb.eop.gov; or mail to OMB, Office of Information and Regulatory Affairs, Attention: Desk Officer for FERC, Washington, DC 20503. Include OMB Control Number 1902-0106 as a point of reference. No person shall be subject to any penalty for failing to comply with a collection of information if the collection of information does not display a valid control number (44 U.S.C. § 3512 (a)).

Instructions:

a. All data reported on this form must represent publicly available recreation amenities and services located within the project boundary. b. To ensure a common understanding of terms, please refer to the Glossary on page 3.

c. Report actual data for each item. If actual data are unavailable, then please estimate. d. Submit a completed form for each development at your project.

Schedule 1. General Data

1.

Licensee Name: ______________________________

Complete the following for each development if more than one.

2.

Project Name: ________________________________

8. Reservoir Surface Area at Normal Pool (acres): __________

3.

Project Number: ______________________________

9. Shoreline Miles at Normal Pool: __________

4.

Development Name: ___________________________

10. Percent of Shoreline Available for Public Use: _______

 

 

 

 

 

States Development/Project Traverses (List state with largest area

11. Data Collection Methods (enter percent for each method used;

total must equal 100%):

within the development/project boundary first):

 

5.

State #1:

_______

 

_____ traffic count/trail count

 

_____ attendance records

6.

State #2:

_______

 

 

_____ staff observation

 

 

 

 

7.

Type of Project License:

Major _____

_____ visitor counts or surveys

_____ estimate (explain)

(check one)

 

Minor _____

 

 

 

 

 

 

 

For 2014, enter only the licensee’s annual recreational construction, operation, and maintenance costs for the development (project). Also, enter the annual recreational revenues for that year.

Item

Licensee’s Annual Recreation Costs and Revenues

(In Whole Dollars)

 

 

 

 

 

 

Construction, Operation and Maintenance Costs

 

 

Recreation Revenues for Calendar Year

 

 

 

 

 

 

12.

Dollar Values

 

 

 

 

 

 

 

 

 

13.

Length of Recreation Season: Summer: From (MM/DD) _________ To _________ Winter: From (MM/DD) _______ To _________

 

 

 

 

Period

Number of visits to all recreational areas at development/project (in Recreation Days)

 

 

 

 

 

 

Annual Total

 

 

Peak Weekend Average (see Glossary)

 

 

 

 

 

 

14.

Daytime

 

 

 

 

 

 

 

 

 

 

15.

Nighttime

 

 

 

 

 

 

 

 

 

 

Respondent Certification: The undersigned certifies that he/she examined this report; and to the best of his/her knowledge, all data provided herein are true, complete, and accurate.

__________________________

_______________________________

_____________________________

Legal Name

Title

Area Code/Phone No.

__________________________

_______________________________

_____________________________

Signature

Date Signed

Reporting Year Ending

TIT LE 18 U.S.C.1001 makes it a crime for any person knowingly and willingly to make to any Agency or department of the United States any false, fictitious or fraudulent statement or misrepresentation as to any matter within its jurisdiction.

Federal Energy Regulatory

Commission FERC

FERC Form 8

Licensed (ydropower Development Recreation Report

Page of

 

 

 

 

 

 

 

 

 

 

 

Schedule 2. Inventory of Publicly Available Recreation Amenities Within the Project Boundary

 

. Enter data for each Recreation Amenity Type a . For User Free b

and User Fee c enter the number of publicly available recreation amenities, located within the project boundary, regardless of provider. For FERC

Approved

d enter the number of amenities identified under User Free

b and User Fee c for which the licensee has an ongoing responsibility for funding or maintenance see Glossary for further detail . For Capacity

Utilization f , of the total publicly available amenities b + c , compare the average non‐peak weekend use see Glossary

for each recreation amenity type during the recreation season, with the highest use, reported on

Schedule

 

, )tem

 

with the total combined capacity of each amenity type and enter a percentage that indicates their overall level of use. For example, if all public boat launches are used to half capacity during the non‐

peak weekend days, enter % should use exceed capacity for an amenity type, enter the appropriate percentage above

.

Number of Recreation Amenities

Total

Capacity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Recreation Amenity Type (a)

 

User

User

FERC

Utilization (%)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Boat Launch Ar as. )mproved areas having one or more boat launch lanes enter number in column e and are usually marked with

Free (b)

Fee (c)

Approved (d)

Units (e)

(f)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

signs, have hardened surfaces, and typically have adjacent parking.

 

 

Lanes

 

 

 

 

 

 

 

 

Facilities with more than

slips on project waters, which include one or more of the following: docking, fueling, repair and

 

 

 

 

 

 

storage of boats; boat/equipment rental; or sell bait/food see Glossary FERC approved .

 

 

 

 

 

 

 

Ma inas.

 

 

 

 

 

 

 

 

 

 

Put‐ins/Take‐outs specifically designated for whitewater access.

 

 

 

 

N/A

 

 

Portag .

Sites designed for launching and taking out canoes/kayaks and the improved, designated, and maintained trails connecting

 

 

 

 

 

such sites

 

 

 

 

N/A

Feet

 

 

enter length of trail in column e .

 

 

 

 

 

 

Whitewater Boati .

 

 

 

 

 

 

 

 

 

 

 

 

Swim Areas.

 

 

 

 

 

Platforms, walkways, or similar structures to facilitate below dam fishing.

 

 

 

 

N/A

 

 

Tailwater Fishing.

Platforms, walkways, or similar structures to facilitate fishing in the reservoir pool or feeder streams.

 

 

 

 

Acres

 

Trails.

 

 

 

 

Sites providing swimming facilities bath houses, designated swim areas, parking and sanitation facilities .

 

 

 

 

 

Reservoir Fishing.

 

 

 

 

 

 

 

 

 

 

 

 

N/A

 

 

 

Narrow tracks used for non‐automobile recreation travel which are mapped and designated for specific use s such as hiking,

 

 

 

Miles

 

biking, horseback riding, snowmobiling, or XC skiing excludes portages, paths or accessible routes; See Glossary .

 

 

 

 

 

Picnic Areas.

 

 

 

 

 

 

 

 

Playground equipment, game courts/fields, golf/disc golf courses, jogging tracks, etc.

 

 

 

 

Acres

 

 

 

 

 

 

 

Locations containing one or more picnic sites each of which may include tables, grills, trash cans, and parking .

 

 

 

Sites

 

Active Recreation Ar as.

 

 

 

 

 

 

 

 

Acres

 

Visitor Centers.

 

Sites established to view scenery, wildlife, cultural resources, project features, or landscapes.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Buildings where the public can gather information about the development/project, its operation, nearby historic,

 

 

 

 

 

 

natural, cultural, recreational resources, and other items of interest.

 

 

 

 

 

 

 

 

Overlooks/Vistas.

 

 

 

Signage/Kiosks/Billboards which provide information about the development/project, its operation, nearby

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

historic, natural, cultural, recreational resources, and other items of interest.

 

 

 

 

Acres

 

Winter Areas.

 

Lands open to the general public for hunting.

 

 

 

 

 

 

Interpretive Displays.

 

 

 

 

 

 

 

 

 

N/A

 

N/A

C mpgrounds.Locations providing opportunities for skiing, sledding, curling, ice skating, or other winter activities.

 

 

 

 

Acres

Hunting Areas.

(ardened areas developed to cluster campers may include sites for tents, trailers, recreational vehicles [RV], yurts,

 

 

 

N/A

 

 

 

 

 

 

 

 

 

 

 

 

Acres

N/A

cabins, or a combination, but excludes group camps .

 

 

 

 

 

 

 

 

 

Sites for tents, trailers, recreational vehicles [RV], yurts, cabins, or a combination of temporary uses.

 

 

 

 

 

 

Campsites.

 

 

Permanent, all‐weather, buildings rented for short‐term use, by the public, for recreational purposes.

 

 

 

 

 

 

 

 

 

 

 

 

 

Areas equipped to accommodate large groups of campers that are open to the general public may be operated by

 

 

 

Sites

 

public, private, or non‐profit organizations .

 

 

 

 

 

 

Cottage Sites.

 

 

 

 

 

 

 

 

 

Places visitors are allowed to camp outside of a developed campground enter number of sites in clmn. e .

 

 

 

N/A

 

 

Group Camps.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N/A

 

 

Inform l Use Areas.

Well used locations which typically do not include amenities, but require operation and maintenance and/or

 

 

 

Sites

 

public safety responsibilities

 

 

 

 

 

 

 

 

 

Dispersed Cam

 

ing Ar as.

 

 

 

 

 

 

 

 

 

 

Other.

 

 

 

 

 

 

Well‐used sites not accounted for elsewhere on this form for visitors entering project lands or waters, without

 

 

 

N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

may have limited development such as parking, restrooms, signage .

 

 

 

 

 

 

trespassing, for recreational purposes

 

 

 

 

 

 

 

 

Amenities that do not fit in the categories identified above. Please specify if more than one, separate by commas :

 

 

 

 

 

 

 

Access Points.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Federal Energy Regulatory

Commission (FERC)

FERC Form 80

Licensed Hydropower Development

Recreation Report

Glossary of FERC Form 80 Terms

Page 3 of 3

Data Collection Methods. (Schedule 1, Item 11) – If a percentage is entered for the estimate alternative, please provide an explanation of the methods used (if submitted on a separate piece of paper, please include licensee name, project number, and development name)

Development. The portion of a project which includes:

(a)a reservoir; or

(b)a generating station and its specifically-related waterways.

Exemption from Filing. Exemption from the filing of this form granted upon Commission approval of an application by a licensee pursuant to the provisions of 18 CFR 8.11(c).

General Public. Those persons who do not have special privileges to use the shoreline for recreational purposes, such as waterfront property ownership, water-privileged community rights, or renters with such privileges.

Licensee. Any person, state, or municipality licensed under the provisions of Section 4 of the Federal Power Act, and any assignee or successor in interest. For the purposes of this form, the terms licensee, owner, and respondent are interchangeable except where:

(a)the owner or licensee is a subsidiary of a parent company which has been or is required to file this form; or

(b)there is more than one owner or licensee, of whom only one is responsible for filing this form. Enter the name of the entity that is responsible for filing this report in Schedule 1, Item 2.1.

Major License. A license for a project of more than 1,500 kilowatts installed capacity.

Minor License. A license for a project of 1,500 kilowatts or less installed capacity.

Non-Peak Weekend. Any weekend that is not a holiday and thus reflects more typical use during the recreation season.

Number of Recreation Amenities. Quantifies the availability of natural or man-made property or facilities for a given recreation amenity type. This includes all recreation resources available to the public within the development/project boundary. The resources are broken into the following categories:

User Free (Schedule 2, column b) - Those amenities within the development/project that are free to the public;

User Fee (Schedule 2, column c) - Those amenities within the development/project where the licensee/facility operator charges a fee;

FERC Approved (Schedule 2, column d) – Those amenities within the development/project required by the Commission in a license or license amendment document, including an approved recreation plan or report. Recreation amenities that are within the project boundary, but were approved by the licensee through the standard land use article or by the Commission through an application for non-project use of project lands and waters, are typically not counted as FERC approved, unless they are available to the public, but may be counted as either user free or user fee resources. The total FERC approved amenities column does not necessarily have to equal the sum of user free and user fee amenities.

Peak Use Weekend. Weekends when recreational use is at its peak for the season (typically Memorial Day, July 4th & Labor Day). On these weekends, recreational use may exceed the capacity of the area to handle such use. Include use for all three days in the holiday weekends when calculating Peak Weekend Average for items 14 & 15 on Schedule 1.

Recreation Day. Each visit by a person to a development (as defined above) for recreational purposes during any portion of a 24-hour period.

Revenues. Income generated from recreation amenities at a given project/development during the previous calendar year. Includes fees for access or use of area.

Total Units (Schedule 2, column e) – Provide the total length, or area, or number that is appropriate for each amenity type using the metric provided.

Trails. Narrow tracks used for non-automobile recreation travel which are mapped and designated for specific use(s) such as hiking, biking, horseback riding, snowmobiling, or XC skiing. Trails are recreation amenities which provide the opportunity to engage in recreational pursuits, unlike paths (means of egress whose primary purpose is linking recreation amenities at a facility) or accessible routes (means of egress which meets the needs of persons with disability and links accessible recreation amenities and infrastructure at a facility).