Ensuring the safety and integrity of dams across Texas is a critical responsibility of the Texas Commission on Environmental Quality (TCEQ), which utilizes the TCEQ-20361 Dam Inspection Form as a comprehensive tool for this purpose. This detailed form serves as a standard for inspectors to evaluate various structural aspects and safety features of dams, including the conditions of embankments, spillways (both service and emergency), outlet structures, and potential hazard conditions downstream, to name a few. Items such as the dam's crest level, ground moisture conditions, and the general health of the embankment are meticulously checked to ensure the dam's ability to perform its functions safely. Furthermore, the form assesses security issues, operational procedures, communication systems, emergency action plans, and the presence and state of early warning and backup power systems. Ranking repair items by priority highlights the importance of addressing the most critical maintenance needs promptly to mitigate risks. The completion of this form not only facilitates a systematic inspection process but also plays a pivotal role in safeguarding the environment and populations living in proximity to these significant water retention structures.
Question | Answer |
---|---|
Form Name | Form Tceq 20361 |
Form Length | 4 pages |
Fillable? | No |
Fillable fields | 0 |
Avg. time to fill out | 1 min |
Other names | TCEQ, TCEQ-20361, Texas, tceq 20361 |
Texas Commission on Environmental Quality
DAM INSPECTION FORM
Dam Name:__________________________________________________________ Inventory No:________________________
Name of Inspector/s: _______________________________________________________________________________________
Name of Contact/s: ________________________________________________________________________________________
Date of Inspection: _________ Start Time: ________ End Time: _________ Weather: ___________________________________
Crest level (at center) above water: _____________________________________________________________________________
Service spillway level ❑ Above or ❑ Below water: _____________________________________________________________
Emergency spillway level above water: __________________________________________________________________________
Ground Moisture Condition: ❑ Dry |
❑ Damp ❑ Wet ❑ Snow ____ ❑ Other: __________________________________ |
||
CREST OF EMBANKMENT General Condition: ❑ Good ❑ Fair ❑ Poor |
Width: ______________________________________ |
||
Problems Noted: ❑ None |
❑ Rutting ❑ Erosion ❑ Poor Drainage |
Height: ______________________________________ |
|
❑ Trees ❑ Depressions |
❑ Bulges |
❑ Livestock Damage ❑ Cracks |
Length: _____________________________________ |
❑ Misalignment of Crest ❑ Misalignment of Utility Poles ❑ Misalignment of Fences or Rails ❑ Sinkhole ❑ Burrows
❑Breached ❑ Other: ___________________________________________________________________________________
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
UPSTREAM EMBANKMENT |
General Condition: ❑ Good ❑ Fair |
❑ Poor Slope: ___________________________________ |
||
Problems Noted: ❑ None |
❑ |
❑ Burrows ❑ Trees |
❑ Cattails |
❑ Depressions |
❑ Bulges ❑ Livestock Damage ❑ Slides ❑ Concrete Decay ❑ Cracks ❑ Sinkhole |
❑ Benching |
|
❑Misalignment of
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
DOWNSTREAM EMBANKMENT General Condition: ❑ Good ❑ Fair ❑ Poor Slope: ________________________________
Problems Noted: ❑ None ❑ Sloughing ❑ Erosion ❑ Too Steep ❑ Burrows ❑ Trees ❑ Cattails ❑ Depressions
❑Bulges ❑ Livestock Damage ❑ Slides ❑ Concrete Decay ❑ Cracks ❑ Sinkhole ❑ Other:_______________________
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
SEEPAGE ON DOWNSTREAM SLOPE Amount: ❑ Major |
❑ Moderate ❑ Minor ❑ None Found |
|
Problems Noted: ❑ None |
❑ Saturation Starts at ___________________ % up Embankment ❑ Presence of Sediment in Flow |
|
❑ Cattails at Toe of Dam |
❑ Surface Water at Toe of Dam |
❑ Seepage Associated with Sloughing ❑ Continuous Flow |
❑ Sporadic Flow |
|
|
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
1 |
DOWNSTREAM HAZARD CONDITIONS |
❑ Narrow Canyon ❑ Wide Canyon ❑ Lightly Sloping Prairie ❑ Pastureland |
|
❑ Large Trees and Forest ❑ Brushy and Scrubby Forest |
❑ No Homes ❑ Lightly Populated ❑ Moderately Populated |
|
❑ Densely Populated ❑ Industrial |
❑ Businesses |
Estimated number of homes: ______________________ |
Comments: ________________________________________________________________________________________________
__________________________________________________________________________________________________________
_________________________________________________________________________________________________________
SERVICE INLET STRUCTURE |
General Condition: ❑ Good |
❑ Fair ❑ Poor |
Problems Noted: ❑ None |
❑ Blockage ❑ Not Located |
❑ Steel Corrosion ❑ Concrete Spalling ❑ Concrete Cracking |
❑ Reinforcement Corrosion |
❑ Missing Parts ❑ Timber Decay ❑ Leakage Below Water Level ❑ Inoperable Valve |
❑Other:_________________________________________________________________________________________________
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
SERVICE OUTLET STRUCTURE General Condition: ❑ Good |
❑ Fair ❑ Poor |
|
Problems Noted: |
❑ None ❑ Blockage ❑ Not Located ❑ Corrosion of Conduit ❑ Presence of Sediment in Flow |
|
❑ Inaccessible |
❑ Concrete Cracking ❑ Concrete Spalling |
❑ Reinforcement Corrosion ❑ Misalignment of Walls/Slabs |
❑ Open Joints |
|
|
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
SERVICE SPILLWAY Condition: ❑ Good ❑ Fair ❑ Poor Depth: ____________________ Width: _____________________
Problems Noted: |
❑ None ❑ Blockage ❑ Not Located |
❑ Trees |
❑ Burrows ❑ |
❑ Livestock Damage ❑ Concrete Cracking ❑ Concrete Spalling |
❑ Reinforcement Corrosion ❑ Damaged |
||
❑ Open Joints |
❑ Sinkholes ❑ Holes in Spillway Chute |
❑ Seepage ❑ Misalignment of Walls/Slabs ❑ Damaged Gates |
❑Nonfunctional Gates ❑ Lubrication of Gates ❑ Testing of Gates
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
EMERGENCY SPILLWAY Condition: ❑ Good ❑ Fair |
❑ Poor |
Depth: __________________ Width: __________________ |
Problems Noted: ❑ None ❑ Blockage ❑ Not Located |
❑ Trees |
❑ Burrows ❑ |
❑ Livestock Damage ❑ Concrete Cracking ❑ Concrete Spalling |
❑ Reinforcement Corrosion ❑ Damaged |
|
❑ Open Joints ❑ Sinkholes ❑ Holes in Spillway Chute |
❑ Seepage ❑ Misalignment of Walls/Slabs ❑ Damaged Gates |
❑Nonfunctional Gates ❑ Lubrication of Gates ❑ Testing of Gates
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
OTHER ITEMS ❑ Major road along crest of dam ❑ Private road or driveway along crest of dam ❑ Vehicle bridge along crest of dam ❑ Culverts built into crest of dam
❑Pipeline immediately downstream from dam - Type of pipeline: ____________________________________________________
❑Water supply line in crest of dam ❑ Other: __________________________________________________________________
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
2 |
REPAIR ITEMS RANKED BY PRIORITY
Item 1: __________________________________________________________________________________________________
Item 2: __________________________________________________________________________________________________
Item 3: __________________________________________________________________________________________________
Item 4: __________________________________________________________________________________________________
SECURITY ISSUES ❑ Vehicle Accessible ❑ Vehicle Gates ❑ Vehicle Fences and Railing ❑ Pedestrian Accessible ❑ Pedestrian Gates and Fences ❑ Obscured from Surveillance ❑ Locks ❑ Breaches in Fence ❑ Evidence of Parties
❑Graffiti ❑ Security System
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
OPERATIONAL PROCEDURES ❑ SOP Available Location Kept: ____________________________________________________
❑Logbook Location of Logbook: ________________________________________________________
❑ Major Events Noted ❑ Staff Training Topics of Training: ______________________________________________________
❑Manual Gate Operations ❑ Powered Gate Operations ❑ Automated Gate Operations
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
COMMUNICATIONS ❑ Directory Available ❑
❑Cell Phone
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
EMERGENCY ACTION PLAN ❑ Available ❑ Filed with TCEQ ❑ Change in Downstream Hazard
Frequency of Update: _____________________________ |
Date of Last Revision: ______________________________ |
Date of Last Exercise: _____________________________ |
|
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
__________________________________________________________________________________________________________
INSTRUMENTATION ❑ Present ❑ Adequately Maintained ❑ Inadequately Maintained ❑ Operational ❑ Data Collected
❑Data Analyzed ❑ Adequately Protected
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
__________________________________________________________________________________________________________
EARLY WARNING SYSTEM ❑ Present ❑ Adequately Maintained ❑ Inadequately Maintained ❑ Operational
Frequency of Maintenance: _____________________________________ Date of Last Exercise: ______________________________
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
__________________________________________________________________________________________________________
3 |
RESERVOIR DRAWDOWN CAPABILITY Method of Drawdown: _____________________________________________________
Maximum Drawdown: _______________________ c.f.s. Frequency of Testing: ________________________________________
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
__________________________________________________________________________________________________________
BACKUP POWER ❑ Present ❑ Adequately Maintained ❑ Inadequately Maintained ❑ Operational
Frequency of Maintenance: _____________________________________ Date of Last Exercise: ______________________________
Comments: _______________________________________________________________________________________________
_________________________________________________________________________________________________________
__________________________________________________________________________________________________________
4 |