On August 1st, my water meter reader came by to collect my reading for the month. I hadn't had my annual backflow assembly test done yet, so I requested he come back on September 1st. When he came back, I asked him how my reading looked. "You have a Class III violation," he said. In order for me to get off of the list and have my water turned back on, I needed to have a certified technician come out and do an inspection. The next day, I contacted my local plumber and scheduled an appointment for them to come out and take a look. After they did their inspection, it turns out that not only did I need a new backflow assembly (which luckily they were able to
Question | Answer |
---|---|
Form Name | Backflow Assembly Test Report Form |
Form Length | 1 pages |
Fillable? | No |
Fillable fields | 0 |
Avg. time to fill out | 15 sec |
Other names | backflow test form pdf, backflow test form, backflow test forms, backflow test sheet |
Backflow Assembly Test Report
Water System Name: |
|
|
|
|
|
File No.: |
|||||
|
|
|
|
|
|
|
|
|
|
|
|
Location of Assembly: |
|
|
|
|
|
|
|
|
|||
Owner of Assembly: |
|
|
|
|
|
|
|
|
|||
Address: |
|
|
City: |
State: |
|
Zip |
|||||
|
|
|
|
|
|
|
|
|
|
|
|
Size of Assembly: |
|
Model No.: |
|
|
Serial No.: |
||||||
|
|
|
|
|
|
|
|
|
|
||
Name of Assembly Manufacturer: |
|
|
|
|
|
|
|
|
I
N T I A L
|
|
|
|
|
|
|
|
|
|
Differential Pressure |
|
|
|
|
|
|
Check Valve #1 |
|
|
Check Valve #2 |
|
Relief Valve |
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
R |
|
|
|
|
|
PSI Across |
|
|
Opened at |
# |
|
|
P |
|
|
PSI Across |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Opened Under 2# or |
¨ |
|
||
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
did not open |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D |
|
|
Closed Tight |
¨ |
|
Closed Tight |
¨ |
|
|
|
|
|
C |
|
|
Leaked |
¨ |
|
Leaked |
¨ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pressure Vacuum
Breaker
AIR INLET: |
|
|
Opened at |
|
# |
Opened Under 1# or |
||
did not open |
¨ |
|
CHECK VALVE: |
|
|
Closed Tight |
¨ |
|
Leaked |
¨ |
R E P A I R S
|
Cleaned |
¨ |
Cleaned |
¨ |
Cleaned |
¨ |
Cleaned |
¨ |
|
Replaced: |
|
Replaced: |
|
Replaced: |
|
Replaced: |
|
|
Disc |
¨ |
Disc |
¨ |
Disc |
¨ |
Air Inlet Disc |
¨ |
|
Spring |
¨ |
Spring |
¨ |
Spring |
¨ |
Air Inlet Spring |
¨ |
|
Guide |
¨ |
Guide |
¨ |
Diaphragm |
¨ |
Check Disc |
¨ |
|
Pin Feather |
¨ |
Pin Feather |
¨ |
Seat(s) |
¨ |
Check Spring |
¨ |
|
Hingepin |
¨ |
Hingepin |
¨ |
¨ |
Other (describe) |
¨ |
|
|
Seat |
¨ |
Seat |
¨ |
Module |
¨ |
|
|
|
Diaphragm |
¨ |
Diaphragm |
¨ |
Other (describe) |
¨ |
|
|
|
Other (describe) |
¨ |
Other (describe) |
¨ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FINAL |
|
PSI Across |
¨ |
|
PSI Across |
¨ |
|
Opened at |
# |
Satisfactory |
¨ |
|
||||||||
|
|
TEST |
|
Closed Tight |
|
Closed Tight |
|
Reduced Pressure |
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
Initial Test By: |
|
|
|
Certification No. |
|
|
|
Date: _______________ |
|
|
|||||||||||
|
Repaired By: |
|
|
|
|
|
|
|
|
|
|
|
|
Date: _______________ |
|
|
||||||
|
Final Test By: |
|
|
|
|
Certification No. |
|
|
|
|
Date: _______________ |
|
|
|||||||||
|
This assembly's INITIAL TEST performance was: |
Satisfactory ¨ Unsatisfactory ¨ |
|
|
|
|||||||||||||||||
|
This assembly's FINAL TEST performance was: Satisfactory ¨ Unsatisfactory ¨ |
|
|
|
||||||||||||||||||
|
I certify the above test has been performed and I am aware of the final performance. |
|
|
|
|
|||||||||||||||||
|
BY: ________________________________________________________ Assembly Owner Representative |
|
|
|||||||||||||||||||
|
Distribution: White - Assembly Owner |
· Pink - Tester · |
Canary - Water Utility |
|
|
|
|