In the landscape of infrastructure development, meticulous inspection and documentation are pivotal for ensuring the integrity of external pipelines, and the FORM EPS 11 plays a critical role in this process within the SYABAS district context. This document is designed as a final joint inspection report, valid for six months before the formal takeover of the project, serving as an essential tool in assessing the installation and functionality of the external pipeline systems associated with water supply. It details the specifics of the development, including the name, file number, and approved plan number, while also demanding the attachment of approved and as-built plans for a comprehensive review. The form methodically categorizes pipeline components such as main pipes, communication pipes, valves of various types, hydrants, and metering devices among others, for inspection, marking them as satisfactory or unsatisfactory and noting relevant comments. This structured evaluation ensures that all aspects of the pipeline installation meet the necessary standards before the system is officially handed over. Inspections are conducted cooperatively by heads of planning/development and technical managers from SYABAS, alongside the head of the district and the secretary of work, ensuring a multi-perspective assessment. The process concludes with acknowledgments from both the consultant and the developer, affirming the accuracy and completeness of the inspection. This thorough approach underscores the commitment to maintaining high standards in public utility management and infrastructure development.

QuestionAnswer
Form NameForm Eps 11
Form Length1 pages
Fillable?No
Fillable fields0
Avg. time to fill out15 sec
Other nameseps 11 subject name, Designation, Sluice, EPS

Form Preview Example

 

 

 

 

 

 

FORM EPS 11

 

SYABAS DISTRICT : ……………………………………………..

 

FINAL JOINT INSPECTION REPORT (EXTERNAL PIPELINE)

 

 

 

( Valid for six (6) months prior taking over date )

 

 

Name of Development

: _____________________________________

File No.

: _____________________________________

Approved Plan No.

: _____________________________________

(Attach approved plan and as-built plan of pipeline)

 

 

 

 

 

Date of Site Visit

: _____________________________________

Phase / Name of location pipeline checked

: _____________________________________

 

Work Description

 

 

 

 

Remarks

A) PIPELINES

 

 

 

Satisfactory

Unsatisfactory

Comments

 

 

 

 

 

(tick relevant

Column)

 

 

 

Type of

Diameter

Length

 

 

 

 

 

pipe

(mm)

(m)

 

 

 

1)

Main Pipes

 

 

 

 

 

 

2)

Communication Pipes

 

 

 

 

 

 

 

 

Type

Nos

Size(mm)

 

 

 

3)

Sluice Valves

 

 

 

 

 

 

4)

Butterfly Valves

 

 

 

 

 

 

5)

Scour Valves

 

 

 

 

 

 

6)

Air Valve

 

 

 

 

 

 

7)

Hydrants

 

 

 

 

 

 

8)

Valve Chambers

 

 

 

 

 

 

9)

Pipe Markers

 

 

 

 

 

 

10)

Pressure reducing valves

 

 

 

 

 

 

11)

Sampling Points

 

 

 

 

 

 

12)

Zone Meters

 

 

 

 

 

 

13)

Bulk meter with proper meter stand/filter

 

 

 

 

 

 

 

/ gate valves

 

 

 

 

 

 

14)

Constant flow valve

 

 

 

 

 

 

15)

Over crossing with/without supports /

 

 

 

 

 

 

 

Spike guards

 

 

 

 

 

 

16)

Other items :

 

 

 

 

 

 

General Comments

Work done Satisfactory and acceptable to be taken over.

Work done Unsatisfactory for those items commented and need to be rectified and another inspection date to be arranged. Others (Please specify)

Remarks :

Jointly Inspected by : Head of Planning/Development Section SYABAS

Jointly Inspected by : Technical Manager

Signature

: _________________________

Signature

: _______________________

Name

: _________________________

Name

: _______________________

Date

: _________________________

Date

: _______________________

 

 

Jointly Inspected by : Head Of District (HOD)

Jointly Inspected by : Secretary Of Work (SOW)

Signature

: _________________________

Signature

: _______________________

Name

: _________________________

Name

: _______________________

Designation

: _________________________

Designation

: _______________________

Date

: _________________________

Date

: _______________________

 

 

Acknowledged by Consultant :______________________

Acknowledged by Developer :________________

Signature

: _________________________

Signature

: _______________________

Name

: _________________________

Name

: _______________________

Designation

: _________________________

Designation

: _______________________

Date

: _________________________

Date

: _______________________