Form Tceq 20170 PDF Details

Texas has a new air quality standard! On February 17, 2017, the Texas Commission on Environmental Quality (TCEQ) approved a new air quality standard for particulate matter 2.5 microns or less in diameter (PM2.5). This new standard replaces the current one, which was set in 2006. PM2.5 are tiny particles that can come from many sources, including automobiles, power plants, and wildfires. They can cause health problems such as asthma attacks and heart attacks. The TCEQ is committed to protecting public health and reducing PM2.5 emissions in Texas. As part of this commitment, the agency has developed a PM2.5 State Implementation Plan (SIP), which outlines how the state will meet the new air quality standard. The TCEQ is accepting public comments on the PM2.5 SIP until April 24, 2017. If you would like to submit comments or have questions about the plan, please visit our website or call our toll-free hotline at 1-800-491-3096 . We appreciate your feedback and look forward to hearing fr

QuestionAnswer
Form NameForm Tceq 20170
Form Length2 pages
Fillable?No
Fillable fields0
Avg. time to fill out30 sec
Other names20170 tceq cafo emission texas form

Form Preview Example

CAFO SOIL MONITORING REPORT FOR GENERAL PERMIT

For Samples Collected in Calendar Year __________

Note: This form may only be used by CAFOs authorized under the General Permit No. TXG920000. CAFOs with individual permits must use Discharge Monitoring Reports (DMRs) or Monthly Effluent Reports (MERs) to report soil data.

GNo samples were collected for the LMU listed below.

Operator Name:

 

 

 

 

 

 

 

Permit No:

TXG92

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Facility Name:

 

 

 

 

 

 

 

Date Samples Collected:

 

 

 

 

 

 

 

Mailing Address:

 

 

 

 

 

 

 

LMU Name or No.: *

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* Should correspond to field designation located on the map included in the PPP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Parameter

Units

Manure/Litter/Wastewater Not Incorporated

 

Manure/Litter/Wastewater Incorporated

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(includes irrigation)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0-2 Inches

 

2-6 Inches

 

6-24 Inches

 

0-6 Inches

 

6-24 Inches

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nitrate-Nitrogen (NO3-N)

ppm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Phosphorus (extractable)

ppm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Potassium

(extractable)

ppm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sodium

(extractable)

ppm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Magnesium (extractable)

ppm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Calcium

(extractable)

ppm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Electrical Conductivity/Soluble Salts

dS/m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pH

 

 

SU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: ppm

= parts per million; considered to be equivalent to milligrams per liter (mg/l)

dS/m = decisiemins per meter; equivalent to millimhols per centimeter (mmhols/cm)

SU = standard units

ATTACH SOIL ANALYSES TO THE REPORT FORM.

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

/

(

)

_____________________________________

 

Printed Name and Title of Responsible Official or Authorized Agent

 

 

Telephone No.

Signature

Date

How to submit: The soil monitoring report with attached soil analyses should be included in the Annual Report that is required to be submitted by February 15 of each year. For State Only

CAFOs, submit the form to the TCEQ, Enforcement Division (MC-224), P.O. Box 13087, Austin, Texas 78711-3087 and provide a copy to the TCEQ Regional Office.

TCEQ-20170 (10/26/04)

Instructions for

CAFO Soil Monitoring Report for General Permit

Only use this form if you are a CAFO authorized under General Permit No. TXG920000. CAFOs with individual permits must use Discharge Monitoring Reports (DMRs) or Monthly Effluent Reports (MERs) to report soil data.

Provide the calendar year of the reporting period in the space provided under the form heading.

Provide the operator’s name and address, facility name, and TXG92 permit number. Provide the date the samples were collected and the Land Management Unit (LMU) name or number. A soil monitoring report must be completed for each LMU owned, operated, controlled, rented or leased by the operator, whether or not soil samples are collected for the LMU.

Note: For LMUs where no samples were collected, check the box at the top right corner of the form and complete the top part of the form and the signature portion of the form.

Completing the chart: If manure, litter or wastewater is not incorporated (i.e., pasture, grassland, permanent crop, etc.), samples must be taken at three depths (0-2", 2-6" and 6-24"). If manure, litter or wastewater is incorporated (i.e. row crops, irrigated wastewater, etc.), only two sample depths are required (0-6" and 6-24"). For each parameter, provide the laboratory results for each required sample depth.

Attachments: Attach a copy of the laboratory analyses to the soil monitoring report form.

Signature: Read the certification statement. Print your name, title, and telephone number. Then sign and date.

How to submit:

TPDES CAFOs: Include the soil monitoring report and attached soil analyses in the Annual Report that is required to be submitted to the TCEQ Enforcement Division (MC 224) and Regional Office by February 15 of each year.

State Only CAFOs: These CAFOs, which are not required to submit an annual Report, must submit the form with attachments to the TCEQ, Enforcement Division (MC-224), P.O. Box 13087, Austin, Texas 78711-3087 and copies should be provided to the TCEQ Regional Office. State Only CAFOs in Erath, Comanche, Hamilton, Bosque and Johnson counties should provide copies of their report forms to the TCEQ Stephenville Office at TCEQ, 580-D Lingleville Road, Stephenville, Texas 76401.

If you have any additional questions about this form or soil sample collection and soil analyses requirements, contact:

TCEQ Land Application Team

Water Quality Division (MC 148)

(512) 239-4671

How to Edit Form Tceq 20170 Online for Free

When you intend to fill out Form Tceq 20170, you won't have to download any sort of software - simply try our online tool. We are dedicated to providing you with the perfect experience with our tool by regularly introducing new capabilities and improvements. Our tool has become a lot more useful with the most recent updates! At this point, editing documents is easier and faster than ever. With just a couple of simple steps, you can start your PDF journey:

Step 1: Click the "Get Form" button at the top of this page to access our editor.

Step 2: Using our state-of-the-art PDF file editor, you're able to do more than simply complete blanks. Edit away and make your documents look high-quality with custom text added, or fine-tune the original input to excellence - all that comes with an ability to insert your personal photos and sign the file off.

With regards to the blank fields of this specific document, here's what you need to do:

1. First of all, while filling in the Form Tceq 20170, beging with the page that contains the following fields:

The right way to prepare Form Tceq 20170 part 1

2. Your next step would be to fill in all of the following blank fields: Phosphorus extractable, Potassium extractable, Sodium extractable, Magnesium extractable, Calcium extractable, ppm, ppm, ppm, ppm, ppm, Electrical ConductivitySoluble, dSm, Note, ppm parts per million considered, and ATTACH SOIL ANALYSES TO THE REPORT.

Writing segment 2 in Form Tceq 20170

Be really careful when completing Magnesium extractable and dSm, since this is where most people make some mistakes.

Step 3: Check what you've entered into the form fields and then click the "Done" button. Go for a 7-day free trial subscription with us and get instant access to Form Tceq 20170 - which you may then start using as you want from your personal account. We do not share any details that you use while dealing with documents at our site.