Oregon Electrical Permit Application Linn Form PDF Details

In the picturesque setting of Linn County, located in the state of Oregon, applying for an electrical permit is a crucial step for both homeowners and contractors looking to undertake any electrical installations. The Oregon Electrical Permit Application Linn form serves as a gateway to ensuring that all electrical work complies with local regulations, safeguarding the well-being of the community. This comprehensive form, available through the Linn County Planning & Building Department, requires applicants to provide detailed information regarding the location of installation, including township, range, section, and tax lot, along with the property owner’s particulars. It distinguishes between contractor installations and those done by property owners, stressing that permits are non-transferable, non-refundable, and expire if work isn’t commenced within 180 days or is suspended for the same duration. The application also elucidates on fees associated with various services such as residential inspections, services/feeders installation, branch circuits, and more, alongside emphasizing the importance of not covering any work until it has been officially approved. This approach not only facilitates a smoother approval process but also ensures that all electrical installations adhere to the highest safety standards.

QuestionAnswer
Form NameOregon Electrical Permit Application Linn Form
Form Length1 pages
Fillable?No
Fillable fields0
Avg. time to fill out15 sec
Other nameslinn county electrical, linn county electrical permit, linn county permits, linn county building permits

Form Preview Example

LINN COUNTY ELECTRICAL PERMIT APPLICATION

Planning & Building Department

PO Box 100, Albany, OR 97321

Phone: 541-967-3816

Fax: 541-926-2060 www.co.linn.or.us

PLEASE COMPLETE ALL SECTIONS, 1 THROUGH 4.

1. LOCATION OF INSTALLATION

Twp _______ Rg ________ Section _________ Tax Lot ________

Building Permit

Property Owner

Address

CityCounty

Directions

Job Description

Work Performed by

PERMITS ARE NON-TRANSFERABLE AND NON-REFUNDABLE AND EXPIRE IF WORK IS NOT STARTED WITHIN 180 DAYS OF ISSUANCE OR IF WORK IS SUSPENDED FOR 180 DAYS.

2.(A) CONTRACTOR INSTALLATION ONLY

Electrical Contractor

Address

City

 

 

State OR

Zip Code

 

Phone:

 

 

 

 

Job No.

 

Contractor Lic.

 

 

Expires

 

 

 

Contractor's Board No.

 

 

Expires

 

 

 

SUPRERVISING ELECT'N:

 

 

 

 

 

License No.

 

 

 

Expires

 

 

 

2. (B) FOR OWNER INSTALLATIONS

Owners Name

Address

City

 

State

 

Zip Code

Phone Number

THIS INSTALLATION IS BEING MADE ON PROPERTY I OWN WHICH IS NOT INTENDED FOR SALE, LEASE OR RENT.

 

 

 

PERMIT NO. E

 

 

 

Issued by

 

Date Issued

 

 

 

 

 

 

 

3. COMPLETE FEE SCHEDULE BELOW

 

 

 

A. Residential per unit

 

 

 

Inspections

Service included:

Items Cost (ea.)

Sum

 

allowed

1000 sq. ft. or less

 

 

113.00

 

 

4

Each additional 500 sq. ft./portion

 

 

20.00

 

 

 

Limited Energy-Residential Only

 

 

48.00

 

 

1

B. Services/Feeders Installation, Alteration or Relocation

 

 

200 amps or less

 

 

85.00

 

 

2

201 amps to 400 amps

 

 

100.00

 

 

2

401 amps to 600 amps

 

 

167.00

 

 

2

601 amps to 1000 amps

 

 

218.00

 

 

2

Over 1000 amps or volts

 

 

500.00

 

 

 

Reconnect only

 

 

68.00

 

 

2

C. Temporary Services/Feeders Installation, Alteration or Relocation

200 amps or less

 

 

68.00

 

2

201 amps to 400 amps

 

 

92.00

 

2

Over 401 amps to 600 amps

 

 

134.00

 

2

Over 600 amps or 1000 volts see "B" above

 

 

 

D. Branch Circuits - New, Alteration or Extension per panel

a)The fee for branch circuits with purchase of service or feeder

Each branch circuit

 

5.00

 

2

b)The fee for branch circuits without purchase of service or feeder

First branch circuit

 

58.00

 

2

Each additional circuit

 

5.00

 

2

E. Miscellaneous (service or Feeder Not Included)

Each pump or irrigation circle

 

68.00

 

2

Each sign or outline lighting

 

68.00

 

2

Commercial limited energy panel

 

68.00

 

2

F. Each additional inspection over the

 

 

 

allowable in any of the above

 

92.00

 

 

Owner's signature

DO NOT COVER ANY WORK UNTIL APPROVAL IS GRANTED.

OFFICE USE ONLY

4. Fees

 

A. Enter total of above fees

 

12% surcharge (.12 x subtotal)

 

Subtotal

 

B. Enter 25% of line A for Plan Review

 

Balance Due

$

How to Edit Oregon Electrical Permit Application Linn Form Online for Free

In case you desire to fill out fillable county oregon online, you don't have to install any applications - just use our online tool. Our tool is consistently developing to provide the very best user experience achievable, and that's because of our dedication to continuous development and listening closely to feedback from users. By taking a few easy steps, it is possible to start your PDF journey:

Step 1: Press the "Get Form" button above. It'll open our editor so that you could begin filling in your form.

Step 2: Using this advanced PDF file editor, it is possible to accomplish more than simply fill in forms. Try all the features and make your docs seem perfect with customized text incorporated, or adjust the original input to perfection - all that accompanied by an ability to add your personal photos and sign the PDF off.

If you want to complete this form, make sure you provide the information you need in each blank field:

1. Begin completing the fillable county oregon online with a number of essential blank fields. Collect all of the necessary information and ensure nothing is omitted!

Ways to fill in linn county oregon permits part 1

2. When the previous array of fields is done, you'll want to insert the necessary particulars in Address, City, Phone, amps to amps, State OR, Zip Code, Over amps to amps, Job No, Over amps or volts see B above, D Branch Circuits New Alteration, a The fee for branch circuits with, Each branch circuit, b The fee for branch circuits, First branch circuit, and Each additional circuit allowing you to move on to the next stage.

linn county oregon permits conclusion process shown (stage 2)

You can potentially make errors when filling in your Each branch circuit, for that reason ensure that you go through it again before you submit it.

Step 3: Right after looking through the fields, press "Done" and you're done and dusted! Right after setting up a7-day free trial account with us, it will be possible to download fillable county oregon online or send it through email directly. The form will also be easily accessible through your personal cabinet with your adjustments. FormsPal guarantees protected form editing without personal information record-keeping or any kind of sharing. Rest assured that your details are in good hands here!