In the aerospace industry, precision and adherence to stringent standards are non-negotiable. The Writable AS9102 Form, or more formally, AS9102 First Article Inspection Form 3: Characteristic Accountability, Verification, and Compatibility Evaluation, is a cornerstone document for ensuring that parts and assemblies meet or exceed the rigorous quality benchmarks set forth by regulatory bodies. This form encompasses a detailed framework for inspecting and documenting the manufacturing process from the part number and name to the serial number, fostering an environment of transparency and accountability. It meticulously records the entirety of an item's characteristic accountability, inspection or test results, and the tools and methods used in the verification process. This includes references, requirements, and results for each product characteristic, alongside the designation of non-conformance when applicable. The form also specifies the FAI inspector and the individual who prepared the form, further cementing its role in maintaining a high level of fidelity to design specifications within the aerospace sector. By providing a standardized approach to first article inspection, the AS9102 Form ensures that every part and assembly not only meets the design requirements but is also properly documented, addressing any deviations with due diligence.
Question | Answer |
---|---|
Form Name | Writable As9102 Form |
Form Length | 1 pages |
Fillable? | No |
Fillable fields | 0 |
Avg. time to fill out | 15 sec |
Other names | writable as9102 forms get, writable as9102 online, as9102 forms download, as9102 rev b forms |
AS9102 First Article Inspection
Form 3: Characteristic Accountability, Verification and Compatibility Evaluation
1. Part Number |
|
|
2. |
Part Name |
|
|
3. Serial Number |
4. FAI Report |
|
|
|
|
|
|
|
|
|
S/N = ___________ |
|
|
|
|
|
|
|
|
|
|
|
|
|
Characteristic Accountability |
|
|
|
Inspection / Test Results |
|
||
5. |
6. Reference |
7. |
8. Requirement |
9. |
Results |
10. Designed |
11. Non- |
14a. FAI Inspection |
14c. FAI Inspector |
Char |
Location |
Characteristic |
|
|
|
Tooling |
Conformance |
Measuring Equipment |
Identification |
No. |
|
Designator |
|
|
|
|
Number |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition |
|||||||
|
|
|
|
|
|
|
|
|
|
12. Prepared by |
|
|
|
|
|
|
13. Date |
|
|
|
|
|
|
|
|
|
|
|
|
Sheet 1 of 1 |