ABC Form B 1 is a form that can be used to document changes to an organization's bylaws. The form can be used to track any changes that are made to the organization's bylaws, including updates to the name or contact information of the organization. The form can also be used to document amendments or changes to the organization's articles of incorporation. Any changes made to the organization's bylaws should be documented using ABC Form B 1 so that there is a record of those changes.
Question | Answer |
---|---|
Form Name | Abc Form B 1 |
Form Length | 2 pages |
Fillable? | No |
Fillable fields | 0 |
Avg. time to fill out | 30 sec |
Other names | ALABAMA, Transmittal, Washington, PSCA |
ABC Form
STATE OF ALABAMA |
|
BUILDING COMMISSION |
DATE |
P O Box 301150 |
|
770 Washington Avenue, Suite 444 |
__________________ |
Montgomery, Alabama |
|
(334) |
|
TRANSMITTAL OF PLANS AND/OR SPECIFICATIONS
|
|
|
|
|
B.C.No. |
|
|
|
|
|
|
|
|
|
|
|
|
|||
OWNER: |
|
ARCHITECT: |
|
|||
PHONE No. |
|
FAX No. ______________ |
PHONE No. |
|
FAX No. ______________ |
|
|
|
|
|
|||
|
|
|
|
|||
STRUCTURAL ENGINEER: |
|
MECHANICAL ENGINEER: |
|
|||
PHONE No. |
FAX No. ______________ |
PHONE No. |
FAX No. ______________ |
|||
|
|
|
|
|||
ELECTRICAL ENGINEER: |
|
OTHER CONSULTANTS: |
|
|||
PHONE No. |
FAX No. ______________ |
PHONE No. |
FAX No. ______________ |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PROJECT
BUILDING |
Number of Stories _____, Sq. Ft. ________, Sprinkled |
YES |
NO |
||||
DATA |
Type of Construction IB, Type of Occupancy Existing Dormitories |
|
|||||
|
Source of Funding: |
State |
Local |
PSCA |
Other______________ |
||
|
|
|
|
|
|
||
|
|
|
|
|
|
||
BID DATE |
(Month/Day/Year) _________________ |
|
|
|
|
Note that in accordance with the Building Commission’s Manual of Procedures, Chapter 3, Paragraph B.1, final approval of the plans and specifications must be obtained prior to the receipt of bids for any work which falls under the Building Commission’s jurisdiction. This rule shall be strictly adhered to and will be strictly enforced.
DOCUMENTS |
Schematic |
Preliminary |
Final |
Revised Final |
SUBMITTED |
Other ____________________________________________ |
|||
|
Written response to previous submittal: Yes |
Not Applicable |
ARCHITECT & ENGINEER SEALS (Final and Revised Final Plans Only):
All architectural drawings bear the architect's seal.
All engineering drawings bear the engineer's seal, date, and signature by engineering discipline. The specification cover sheet bears the primary design professional’s seal.
The specification cover sheet bears the engineer’s seals, date, and signature by all engineering disciplines.
DOCUMENTS SUBMITTED TO BUILDING COMMISSION BY:
Please check if you wish to receive the Project Comment Letter by
below: |
|
|
|
|
Architect ______________________ |
Owner ________________________ |
|||
|
email address |
email address |
||
|
____________ |
________________________________ ___ |
||
|
A/E TYPED OR PRINTED NAME |
A/E SIGNATURE |
|
|