Abc Form C 13 PDF Details

The Abc Form C 13 is the form submitted by the taxpayer to request a copy of their tax return. Once filed, it can take up to 12 weeks for an individual's tax return to be delivered. This blog post will outline how taxpayers can speed up this process and what they should do if they never receive the requested material through email or mail.

Below are a few facts you might like to check before dealing with the abc form c 13.

QuestionAnswer
Form NameAbc Form C 13
Form Length3 pages
Fillable?Yes
Fillable fields5
Avg. time to fill out1 min 45 sec
Other namesCONTRACTING, routed, ROUTING, C-9

Form Preview Example

ABC Form C-13 August 2001

TO: STATE OF ALABAMA

BUILDING COMMISSION

770 Washington Avenue, Suite 444

Montgomery, AL 36130-1150

(334) 242-4082 FAX (334) 242-4182

CERTIFICATE OF SUBSTANTIAL COMPLETION

ROUTING PROCEDURES ON REVERSE SIDE

BC# _________________________

OWNER(S):

ARCHITECT:

CONTRACTOR:

BONDING COMPANY:

PROJECT

Substantial Completion has been achieved for

the entire Work

the following portion of the Work _________

________________________________________________________________________________________________________

_______________________________________________________________________________________________________.

The Date of Substantial Completion of the Work covered by this certificate is established to be.

"Substantial Completion" means the designated Work is sufficiently complete, in accordance with the Contract Documents, such that the Owner may occupy or utilize the Work for its intended use without disruption or interference by the Contractor in completing or correcting any remaining unfinished Work. The Date of Substantial Completion is the date upon which all warranties for the designated Work commence, unless otherwise agreed and recorded herein.

Punch List: A page list of items to be completed or corrected prior to the Owner’s approval of Final Payment is attached

hereto, but does not alter the Contractor’s responsibility to complete or correct all Work in full compliance with the Contract Documents. The Contractor shall complete or correct all items on the attached list, ready for re-inspection for Final Acceptance,

within 30 days after the above Date of Substantial Completion, unless another date is stated here:.

If completed or corrected within this period, warranties of these items commence on the Date of Substantial Completion, otherwise such warranties commence on the date of Final Acceptance of each item.

Only one (1) originally executed substantial completion form should be routed for signature. B.C. office will forward the original to the Owner and provide copies to all other parties.

RECOMMENDED BY:

ARCHITECT: __________________________________________________________________

CONTRACTING PARTIES:

CONTRACTOR _______________________________________________________________

OWNER ______________________________________________________________________

_______________________________________________________________________

APPROVALS:

BUILDING COMM.INSPECTOR: _________________________________________________

BUILDING COMM. CHIEF INSPECTOR: __________________________________________

BUILDING COMM. DIRECTOR: _________________________________________________

Page 1 of 1

DATE: ______________

DATE:_______________

DATE:_______________

DATE:_______________

DATE:_______________

DATE:_______________

DATE: ______________

CERTIFICATE OF SUBSTANTIAL

COMPLETION

ROUTING PROCEDURE

Only one (1) originally executed substantial completion form should be routed for signature. B.C. office will forward the original to the owner and provide copies to all other parties.

ARCHITECT/ENGINEER: Please forward to Contractor after signature and date. Please provide Owner with local B.C. Inspector’s name & home address.

CONTRACTOR: Please forward to Owner after signature and date.

OWNER: Please forward to local B.C. Inspector’s home address after signature and date. You may contact B.C. office at (334) 242-4082 if B.C. Inspector’s name/address is needed.

B.C. INSPECTOR: Will forward document to B.C. office for review and distribution.

NOTICE

THE EXECUTED “GENERAL CONTRACTOR’S ROOFING GUARANTEE” (ABC Form C-9) AND ANY OTHER ROOFING WARRANTY REQUIRED BY THE CONTRACT MUST ACCOMPANY THIS CERTIFICATE TO OBTAIN ABC APPROVAL.

How to Edit Abc Form C 13 Online for Free

It won't be difficult to complete 2001 working with our PDF editor. Here's how you can rapidly develop your template.

Step 1: You should select the orange "Get Form Now" button at the top of this page.

Step 2: Now you are on the form editing page. You can edit, add information, highlight certain words or phrases, insert crosses or checks, and insert images.

Prepare the 2001 PDF and enter the information for every single area:

APPROVALS empty spaces to consider

Step 3: Press the Done button to make sure that your completed document may be transferred to any device you select or mailed to an email you specify.

Step 4: In order to avoid all of the difficulties in the foreseeable future, try to generate as much as a few copies of the form.

Watch Abc Form C 13 Video Instruction

If you believe this page is infringing on your copyright, please familiarize yourself with and follow our DMCA notice and takedown process - click here to proceed .