In the competitive world of contracting, the Bid Proposal form serves as a critical document, outlining the comprehensive requirements and qualifications needed for project bids. Utilized in this instance for the proposed alterations at the Golden Door Charter School by Friends of Golden Door Charter School, Inc., located in Jersey City, NJ, this form encapsulates a myriad of essential details. Prospective bidders are mandated to include an array of components such as the Bid Proposal Form itself, statements of bidder qualifications encompassing compliance with local wage acts, various affidavits ranging from non-collusion to stockholder disclosures, certificates of insurance, and a multitude of other verification documents. Additionally, the form highlights the necessity for bidders to review contract documents, site conditions, local laws, and bond requirements thoroughly. Moreover, it stipulates project specifics, including lists of required subcontractors for trades such as structural steel, plumbing, HVAC, and electrical work, thereby setting a high bar for compliance and completeness. This ensures that the bidding process remains transparent, competitive, and accessible to all qualified entrants, significantly influencing the project's trajectory from the outset. The bid proposal form, therefore, stands as a testament to the meticulous planning and regulatory adherence fundamental to public contracting endeavors.
| Question | Answer |
|---|---|
| Form Name | Bid Proposal Template Form |
| Form Length | 23 pages |
| Fillable? | No |
| Fillable fields | 0 |
| Avg. time to fill out | 5 min 45 sec |
| Other names | tender proposal example pdf, tender response template word, tender bid template, tender bid example |
BID PROPOSAL
Proposed
Golden Door Charter School Alterations
for the
Friends of Golden Door Charter School, Inc.
180 9th Street, Jersey City, NJ
The following items must be included in the Bid:
Bid Proposal Form
Statement of Bidder Qualifications, including:
Compliance with New Jersey Prevailing Wage Act
Stockholder or Partnership Disclosure Affidavit
Certificate of Insurance Statement
Affidavit Regarding List Of Debarred, Suspended Or Disqualified Bidders
Performance Record
Certification Statement
Certification of No Material Change of Circumstances
List of References
Affirmative Action Acknowledgement
Bid Security
Consent of Surety (Bonding Company’s “Guarantee Certificate”)
State of New Jersey DPMC “Notice of Classification” Affidavit
State of New Jersey DPMC “Uncompleted Contracts” Affidavit
State of New Jersey “Public Works Contractor Registration Act”
Certificate of Authority to Perform Work in NJ issued by the Department of Treasury, Division of Taxation. (see sample)
Business Registration Certificate issued by Department of Treasury, Division of Revenue. (see sample)
C. 271 Political Contribution Disclosure Form
By submitting this Bid, the Bidder also acknowledges that he has reviewed the following:
Contract Documents, the Site, local conditions and laws that may affect cost, progress or performance
Maintenance, Performance and Payment Bond Requirements
Proposed Agreement
_________________________________ |
__________________________ |
Name of Company |
Contract for |
Golden Door Charter School |
SECTION C.1 – BID PROPOSAL FORM
GENERAL NOTE TO ALL BIDDERS: Proposals shall be submitted upon the detached Bid Proposal Form, or a copy thereof, as furnished by the Architect. Bid Proposal Forms shall be completely filled out and submitted in compliance with the Bidding Documents. Please attach a business card and submit this proposal to:
Friends of Golden Door Charter School, Inc. |
|
180 9th Street, Jersey City, NJ |
Company: |
|
|
|
Address: |
|
Phone: |
|
Fax: |
DATE:_________________________ |
|
|
|
|
Trade: |
The undersigned, having visited the site and carefully examined the full set of Bidding Documents, as well as the Contract Specifications, including any and all of the Addenda enumerated herein and issued prior to the bidding date, along with the complete set of Contract Drawings numbered ___ through ___ for:
Golden Door Charter School Alterations
hereby proposes to furnish all necessary materials, labor, equipment and systems required to complete all Work as required by or inferred from the Contract Documents for the sum(s) stipulated below:
BID PROPOSALS:
OVERALL BID:
BASE BID SOC
SINGLE OVERALL LUMP SUM BID
State the lump sum price for all necessary General Construction, Plumbing, Mechanical and Electrical Work
_________________________________________________________________Dollars
($_________________)
Golden Door Charter School |
All paperwork required of the Prime Contractor shall also be submitted with this bid for each subcontractor including the Notice of Classification, Uncompleted Contracts affidavit, Certificate of Registration, along with evidence of security performance. One Bid Bond for the entire project is acceptable. If no subcontractor will be used, state “prime contractor” in the applicable space(s) below so that it is clear whether the prime contractor or a subcontractor will be performing the work in each of the listed trades. In this case, the Prime Contractor must have applicable Notice of Classification and Certificate of Registration for that trade.
All bidders must include at the time of bid, subcontractors with classifications in Structural Steel (C029), Plumbing (C030), HVAC (C039), and Electrical (C047).”
Subcontractor List: |
State the following subcontractors who will be used on this Project: |
Structural Steel:
C029
Plumbing:
C030
HVAC:
C039
Electrical:
C047
FAILURE TO PROVIDE SUBCONTRACTOR NAMES AND DOCUMENTATION IN EACH CATEGORY ABOVE MAY BE CAUSE FOR BID TO BE REJECTED.
ALTERNATE BIDS:
ALTERNATE BID ??? RENOVATION WORK –
State the overall lump sum price to be added to the Base Bid______ for all work necessary to
complete the proposed additional ________________________as outlined in the documents.
_________________________________________________________________Dollars
ADD ($_______________________)
Golden Door Charter School |
ALLOWANCES:
A.The Architect shall authorize any Work to be performed with allowances prior to the execution of the Work.
B.Should the cost of the specified Work be more than the allowance, the Owner will pay the added cost. Should the cost of the specified Work be less than the allowance, then the Contractor shall credit the Owner the full remaining balance of said allowance(s).
C.Refer to Section 01210 “Allowances” for additional information.
The following allowance must be included within EACH Prime Contractor’s Bid.
|
|
|
|
Allowance |
|
|
Allowance |
|
|
|
|
The Overall Contract Bid shall include the above allowance.
$____,000.
UNIT PRICES:
A. Should the occasion arise that the extent of certain Work required by the Contract Documents is increased or decreased, the Contract Sum shall be adjusted accordingly on the basis of the Unit Prices described below.
B.These Unit Prices shall include all materials, labor, transportation, tools, equipment, services and installations necessary to complete the work described. Overhead, insurance and profit shall also be included.
C.Refer to Section 01270 “Unit Prices” for additional information.
GENERAL CONSTRUCTION UNIT PRICES |
|
|
|
|
|
|
|
|
|
|
|
____ |
|
|
$________ |
|
/ |
|
|
|
|||
____ |
|
|
$________ |
|
/ |
ADDENDA:
The Bidder hereby acknowledges the receipt of the following Addenda to the Specifications and Drawings.
Addendum #____ dated __________ 20__ |
Addendum #____ dated __________ 20__ |
PROJECT SCHEDULE REQUIREMENTS:
The Bidder hereby affirms that all Work embodied within this Contract will be Substantially Complete prior to June 30, 2011. The Contractor is advised that work on the Project site is not expected to commence prior to November 15, 2010. Each Bidder agrees to provide staff and equipment necessary, including additional crews or shifts, to meet the milestone dates as outlined above.
Golden Door Charter School |
Bidder agrees to provide staff and equipment necessary, including expedited shop drawing preparation, expedited factory ordering and delivery efforts, expedited installation efforts and expedited clean up/punch list corrective efforts to meet the substantial completion date.
LIQUIDATED DAMAGES:
It is understood that the Date for Substantial Completion is an essential condition of this Contract and that TIME IS OF THE ESSENCE for this project. The Contractor shall be subject to a minimum assessment of Liquidated Damages in the amount of $1,000 per day for each calendar day that work is not completed beyond the required date stipulated above within the ‘Schedule Requirements’.
Submitted by:
|
|
|
Subscribed |
and |
sworn |
|
_____________________________________ |
before me |
on |
this the |
|||
(Official / Legal Name of Business) |
|
________________ day of |
||||
|
|
|
||||
_____________________________________ |
____________ in the year |
|||||
|
|
|
||||
(Business Address) |
|
|
20__. |
|
|
|
_____________________________________ |
_____________________ |
|||||
(Town) |
(State) |
(Zip) |
||||
|
|
|
||||
|
|
|
Notary Public of N.J. |
|||
_____________________________________ |
|
|
|
|||
(Business Telephone) |
(Fax) |
|
|
|
||
|
|
|
My Commission |
expires |
||
_____________________________________ |
_____________, 20__. |
|||||
|
|
|
|
|
||
_____________________________________ |
NOTARY SEAL: |
|||||
(Signature of Principal or Authorized Agent) |
|
|
|
|||
_____________________________________
(Print Name of Principal or Authorized Agent)
END OF SECTION C.1
Golden Door Charter School |