Csi Form 13 1A PDF Details

In the lifecycle of any construction project, the accurate execution of documents and adherence to specified materials and products are pivotal. Among these critical documents, the CSI 13 1A form, known officially as the Substitution Request (After the Bidding/Negotiating Phase), plays a significant role in ensuring the smooth progression and integrity of a project. This form allows contractors and subcontractors to propose alternatives to materials, products, or equipment originally specified in the contract documents. The items it covers range widely, encompassing the project and request identification, details about the proposed substitution including the manufacturer, model number, and installer, as well as a thorough comparative analysis between the specified and proposed products. Moreover, the form assesses the impact of the proposed substitution on the project’s timeline and budget, including potential savings for the owner and implications on other parts of the work. It mandates the attachment of supporting data, such as drawings, product data, sample reports, and tests, cementing its role as a comprehensive tool for maintaining transparency, accountability, and quality within construction projects.

QuestionAnswer
Form NameCsi Form 13 1A
Form Length1 pages
Fillable?No
Fillable fields0
Avg. time to fill out15 sec
Other namescsi substitution request form, csi form 13 1a, csi forms download, substitution request form

Form Preview Example

SUBSTITUTION

REQUEST

(After the Bidding/Negotiating Phase)

Project:

 

Substitution Request Number:

 

 

 

 

From:

 

To:

 

Date:

 

 

 

 

A/E Project Number:

 

Re:

 

Contract For:

 

 

 

 

 

 

 

 

Specification Title:

 

 

 

 

 

Description:

 

Section:

Page:

Article/Paragraph:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proposed Substitution:

 

 

 

 

 

 

 

 

 

 

 

 

Manufacturer:

 

 

 

Address:

 

 

 

Phone:

 

 

Trade Name:

 

 

 

 

 

 

 

 

Model No.:

 

 

Installer:

 

 

Address:

 

 

Phone:

 

History: ☐ New product

1-4 years old ☐ 5-10 years old

☐ More than 10 years old

 

Differences between proposed substitution and specified product:

Point-by-point comparative data attached — REQUIRED BY A/E

Reason for not providing specified item:

Similar Installation:

 

 

 

 

 

Project:

 

 

 

Architect:

 

Address:

 

 

 

Owner:

 

 

 

 

 

 

Date Installed:

 

Proposed substitution affects other parts of Work:

☐ No

☐ Yes; explain

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Savings to Owner for accepting substitution:

 

 

 

 

 

($

 

).

 

 

 

 

 

 

 

 

 

 

 

 

Proposed substitution changes Contract Time:

☐ No

☐ Yes [Add]

[Deduct]

 

 

 

 

 

days.

 

 

 

 

 

 

 

 

 

 

 

 

Supporting Data Attached: ☐Drawings

☐Product Data

☐ Samples

☐ Tests

☐ Reports

 

 

 

 

 

 

 

 

 

 

 

 

© Copyright 2013, CSI,

Page ___ of ___

Form Version: September 2013

110 S. Union St., Suite 100, Alexandria, VA 22314

 

CSI Form 13.1A

How to Edit Csi Form 13 1A Online for Free

Our PDF editor that you're going to use was designed by our finest web developers. It is easy to obtain the csi form file fast and conveniently applying our software. Simply adhere to this specific instruction to get started.

Step 1: Click the orange button "Get Form Here" on the following website page.

Step 2: The instant you get into our csi form editing page, you will find all of the functions you may take about your file at the upper menu.

Create the csi form PDF by entering the details needed for each individual part.

part 1 to completing csi substitution request form pre bid

You have to write down the appropriate details in the History New product years old, Differences between proposed, Pointbypoint comparative data, Reason for not providing specified, Similar Installation, Project, Address, Architect, Owner, Date Installed, Proposed substitution affects, and Savings to Owner for accepting area.

History  New product   years old, Differences between proposed, Pointbypoint comparative data, Reason for not providing specified, Similar Installation, Project, Address, Architect, Owner, Date Installed, Proposed substitution affects, and Savings to Owner for accepting in csi substitution request form pre bid

Write the necessary data in Proposed substitution changes, Yes, Add, Deduct, days, Supporting Data Attached, Drawings, Product Data Samples, Tests, Reports, Copyright CSI S Union St Suite, Page of, and Form Version September CSI Form A segment.

part 3 to entering details in csi substitution request form pre bid

Step 3: Press the "Done" button. Now you can upload the PDF file to your device. As well as that, you can easily forward it by means of electronic mail.

Step 4: In order to prevent probable future risks, make sure to get around several copies of each document.

Watch Csi Form 13 1A Video Instruction

Please rate Csi Form 13 1A

1 Votes
If you believe this page is infringing on your copyright, please familiarize yourself with and follow our DMCA notice and takedown process - click here to proceed .