In the world of construction and excavation, safety is paramount, a fact underscored by the meticulous detail found in the Excavation Competent Person Evaluation Form – ET-1. This document serves as a rigorous tool for assessing those designated as competent persons within the realm of excavation work. Its purpose is not only to ensure that individuals in charge possess the required knowledge and training in key areas such as soil analysis, use of protective systems, and understanding the intricate requirements of 1926 Subpart P, but also to confirm their authority to manage and mitigate hazards effectively. Through a comprehensive evaluation list, the form prompts evaluators to confirm the presence of critical competences, ranging from the ability to conduct thorough jobsite inspections—to taking decisive actions such as halting work to address safety concerns. By requiring detailed comments alongside yes or no responses, the form facilitates a nuanced assessment of each individual's readiness to oversee excavation sites safely. Not only does this form emphasize the importance of theoretical knowledge and practical authority, but it also highlights the necessity for ongoing vigilance in inspecting equipment and responding to environmental changes or incidents that could increase hazards. This document, ultimately, is a testament to the industry's commitment to safety and provides a structured means to ensure those responsible for excavation sites are fully equipped to uphold the highest safety standards.
Question | Answer |
---|---|
Form Name | Evaluation Form Et 1 |
Form Length | 1 pages |
Fillable? | No |
Fillable fields | 0 |
Avg. time to fill out | 15 sec |
Other names | worksheet, reliance, corrective, descriptive |
|
|
|
Appendix C1: Excavation Competent Person Evaluation Form – ET1 |
|||||
|
|
|
Excavation Competent Person Evaluation Form – |
|||||
Employee Name: |
|
Date: |
|
|||||
Job Title(s): |
|
|
Years In Job: |
|
||||
Department: |
|
|
Years in Department: |
|
||||
Phone Number: |
|
|
Total years service: |
|
Instructions: Evaluate the designated individual by completing the items in the evaluation list by indicating the appropriate response and noting descriptive conditions in the comments column.
Description of Evaluation Item:
|
Does the designated individual have training and |
Yes |
|
|
No |
|
Comments |
|
|||
|
knowledge of: |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
The requirements of 1926 Subpart P? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The use of protective systems? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Soils analysis and classification? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The use of the soil classification worksheet? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hazardous environments? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
Does the designated individual have the authority |
Yes |
|
|
No |
|
Comments |
|
|||
|
to: |
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
Take prompt corrective measures to eliminate existing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
and predictable hazards? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
To stop work? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Does the designated individual have the |
Yes |
|
|
No |
|
Comments |
|
|||
|
knowledge and authority to conduct inspections: |
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
Of the jobsite on a daily basis? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Of adjacent areas? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Of the protective systems? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prior to the start of work? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
As needed throughout the work shift? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
After a rainstorm or hazardincreasing occurrence? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Of excavation safety equipment used in protective |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
systems? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Using the Excavation Site Checklist and Daily Field |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Report? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Comments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Supervisor:Date:
24
The official version of this information will only be maintained in an