Form Ce 1094 PDF Details

Every business owner is responsible for filing accurate tax forms. For some, this may be filing a 1040EZ. For others, it may be more complicated and require additional forms like the 1094. This form is used to report healthcare coverage provided to employees. It's important to file this form correctly so that the IRS has an accurate picture of your company's health coverage. If you're not sure how to complete the 1094, consult with a professional accountant or tax preparer. They can help ensure that your return is filed accurately and on time. Failing to do so could result in penalties from the IRS. So, if you're unsure about anything related to the 1094, don't hesitate to reach out for help.

QuestionAnswer
Form NameForm Ce 1094
Form Length1 pages
Fillable?No
Fillable fields0
Avg. time to fill out15 sec
Other namespermits excavation worksheet online, grading permits excavation, permits fill worksheet pdf, grading permits fill

Form Preview Example

Department of Public Works & Engineering

Building Code Enforcement Branch

GRADING PERMITS FOR EXCAVATION AND FILL WORKSHEET

Appendix E of the Houston Adopted 2012 International Building Code as Amended specifies permit requirements for grading a lot of any size on private property. Section 1 - Identifies when a separate “Grading Permit” is required. Section 2 - Identifies the type of grading permit required, “Engineered Grading or Regular Grading”, when a “Geotechnical Report” is required in the plans, and when a “Storm Availability Letter” is required to be attached to the submittal documents.

Grading Permits are required for any excavations or fill, or combination thereof, and includes:

Excavation Permits - Including work proposing the mechanical removal of earth material.

Fill Permits - Including a deposit and/or relocation of earth material placed by artificial means.

IMPORTANT NOTE: THERE SHALL BE NO FILL WITHIN THE PUBLIC RIGHT-OF-WAY

SECTION 1: Are Permits And Plans Required?

A Grading Excavation permit & plans are required if “Yes” is answered to any question 1 through 4.

________

(1)

Does the excavation work affect the lateral support or increase the stresses in, or pressure upon any adjacent or

 

 

contiguous property?

________

(2)

When excavating below finish grade for basements and footings of a building, retaining wall or other structures

 

 

authorized by a valid building permit, will there be an unsupported excavation height greater than 5 feet after

 

 

completion of such structure?

________

(3)

Will there be any excavation greater than 5 feet in depth?

________

(4)

Will the excavation create a cut slope 2 feet or more in height but less than 5 feet, with a slope steeper than 1

 

 

unit vertical in 1.5 units horizontal? (66.7% slope)

A Grading Fill permit and plans are required if “Yes” is answered to any question 5 through 10. (50 cubic yards = 1350 sq. ft. @ 1 ft depth)

________

(5)

Does the fill work affect the lateral support or increase the stresses in, or pressure upon any adjacent, or

 

 

contiguous property?

________

(6)

Does the scope of work include fill that is 3 feet or more in depth?

________

(7)

Does the scope of work include fill greater than 1 foot but less than 3 feet, with a slope that is equal to or greater

 

 

than 1 unit vertical in 5 units horizontal? (20% slope)

________

(8)

Does the scope of work include fill that is greater than 50 cubic yards on any one lot?

________

(9)

Does the proposed fill obstruct any natural and/or previously constructed drainage course?

________

(10)

Is proposed fill greater than 1 ft in depth and intended to support a structure, “now or in the future”?

SECTION 2: What Type Of Permits And Plans Are Required?

NOTE: When the building official has cause to believe that geologic factors may be involved, grading will be required to conform to recommended grading, inspection, and testing by a Professional Engineer.

Engineered grading plans are required if “Yes” is answered to question 11. Plans shall be designed, sealed, signed, and dated by a professional engineer. These grading permits shall be designated as “Engineered Grading”.

(5000 cubic yards = 135,000 sq. ft. @ 1 ft depth)

________ (11) Does the grading project exceed 5000 cubic yards?

Grading plans shall be designated “Regular Grading” if “Yes” is answered on question 12: (no engineer req.)

________

(12)

Does the grading involve less than 5000 cubic yards?

A Geotechnical Report is required if “Yes” is answered to any one of questions 13, 14 or 15:

________

(13)

Will there be any cut slopes steeper than 1 unit vertical in 2 units horizontal (50% slopes)?

________

(14)

Is there any grading that requires an engineered design? (Reference item 11 above.)

________

(15)

Does the site include any special geological features and/or considerations for any grading?

A Storm Availability Letter is required to be included with the submitted documents if “Yes” is answered to questions

16 or 17:

________

(16)

Does the scope of work to lots exceeding 15,000 sq. ft., include any new impervious cover?

________

(17)

Does the project include connection to the city’s public storm sewer system?

 

 

ADDRESS

 

 

 

 

PROJECT #

 

DATE

 

PRINT

 

 

 

 

 

 

 

 

NAME OF APPLICANT

 

SIGNATURE

 

 

 

Form No: CE-1094 rev 02/01/2016

(832) 394-8810

Public Works & Engineering

Page 1 of 1

How to Edit Form Ce 1094 Online for Free

Whenever you want to fill out form ce 1094 houston, it's not necessary to download and install any kind of applications - simply try our online tool. To keep our tool on the forefront of convenience, we work to integrate user-oriented features and enhancements regularly. We are routinely looking for suggestions - help us with revolutionizing PDF editing. With some basic steps, it is possible to begin your PDF editing:

Step 1: Simply click on the "Get Form Button" at the top of this page to get into our pdf file editing tool. There you'll find all that is needed to fill out your document.

Step 2: This editor lets you work with your PDF in many different ways. Improve it by writing your own text, correct original content, and include a signature - all at your convenience!

To be able to fill out this document, be certain to provide the necessary information in every single area:

1. While filling in the form ce 1094 houston, make certain to complete all essential blanks within its relevant section. This will help to expedite the work, allowing for your details to be handled fast and accurately.

Tips to prepare grading permits excavation part 1

2. Now that this array of fields is done, you need to include the essential specifics in Grading plans shall be designated, Does the grading involve less, A Geotechnical Report is required, Will there be any cut, Is there any grading that requires, Does the site include any, A Storm Availability Letter is, Does the scope of work to, Does the project include, ADDRESS, PRINT NAME OF APPLICANT, PROJECT, DATE, SIGNATURE, and Form No CE rev so that you can progress to the next stage.

Writing part 2 in grading permits excavation

Always be really mindful when completing ADDRESS and DATE, as this is the section in which a lot of people make mistakes.

Step 3: You should make sure your details are correct and click "Done" to progress further. Sign up with us today and immediately obtain form ce 1094 houston, ready for downloading. All adjustments you make are kept , which enables you to customize the document later on as required. At FormsPal, we strive to make certain that your details are maintained private.