At the heart of ensuring the U.S. Postal Service's smooth operation lies the strategic use of the PS Form 4805, a crucial document designed to manage and record maintenance work orders effectively. This form serves as a structured approach for requesting maintenance work, whether for routine checks or urgent repairs, making sure that all necessary information is captured in a standardized format. Key details such as the work site number, equipment details, request origins, and priority codes are meticulously recorded, streamlining the assessment and allocation of work to the relevant crew. Furthermore, the form assists in tracking the maintenance process from initiation through completion, including descriptions of the work requested and performed, parts issued, and the crucial sign-offs confirming the satisfactory conclusion of work. Not only does it cater to equipment breakdowns, but it also insists on a detailed report of the downtime events, including the specific cause, thus enabling more efficient diagnostics and quicker resolution times. The PS Form 4805 demonstrates a comprehensive strategy for maintenance management, marrying efficiency with accountability, ensuring that postal service operations face minimal disruptions and maintain the high level of reliability expected by all stakeholders.
Question | Answer |
---|---|
Form Name | PS Form 4805 |
Form Length | 2 pages |
Fillable? | Yes |
Fillable fields | 115 |
Avg. time to fill out | 23 min 30 sec |
Other names | ps 4805, mechanization, 1998, ps form 4805 |
U.S. Postal Service
Maintenance Work Order Request
Sub- |
Register |
Work Order |
Prior- |
Work |
site |
Number |
Number |
ity |
Code |
|
|
|
|
|
Equipment Acronym
Equipment Eqpt. Number Class
Issued
Date
Work Request (To be completed by the requesting office or organization)
Office Name |
|
|
|
City |
|
|
|
State |
ZIP + 4 |
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Floor |
Area |
|
Room |
Person to Contact |
|
|
|
|
|
Phone (Include area code) |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Requested By (Name and title) |
|
|
Originating Department |
Phone (Include area code) |
Date Required |
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description of Work Requested (Equipment name and number if known) |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Approved By (Name, title, and signature) |
|
|
|
|
Date |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Work Order (To be completed by Maintenance) |
|
|
|
|
|
|
|
|
|
|
|||
Description of Work Performed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Work Completed By |
|
|
|
|
Date |
|
Work Accepted By (Close Work Order) |
|
Date |
||||
|
|
|
|
|
|
|
|
|
|
|
|||
Parts Issue (Use this section to record parts issues when MARS is unavailable for use.) |
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part Number |
|
Nomenclature |
|
Quantity |
|
Issued By |
|
|
|
Issued To |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Official Disposition (Use this section to verify work completion and closing of the Maintenance Work Order.) |
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
||||
Maintenance Official Approval (Signature and title) |
|
|
|
Date |
|
Close Work Order (Maint. Ops. Support initials) |
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PS Form 4805, June 1998
Equipment Breakdown Work Order
Sub- |
Register |
Work Order |
Prior- |
Work |
site |
Number |
Number |
ity |
Code |
|
|
|
|
|
Equipment Acronym
Equipment Eqpt. Number Class
Issued
Date |
Crew No. |
Est. Time |
Instructions
1.Use this report to record information about all automation or mechanization equipment breakdowns that last 18 min- utes or more.
2.Provide the work order number generated by MARS associated with the breakdown.
3.Provide detailed information about the problem and the diagnostic action taken. Attach additional pages if necessary to give a complete picture of the downtime events.
4.This report should be passed on to each tour until the equipment has been repaired.
5.This report should be reviewed and signed by both Maintenance and Opera- tions personnel.
6.After the repairs are completed and signed off on this report, forward the report to the Maintenance Operation Sup- port unit.
Work Request (To be completed by the requesting office or organization)
Office Name |
|
|
|
|
City |
|
|
|
|
|
State |
ZIP + 4 |
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Floor |
|
Area |
|
Room |
|
Person to Contact |
|
|
|
|
|
Phone (Include area code) |
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Requested By (Name and title) |
|
|
|
|
Originating Department |
|
Phone (Include area code) |
Date Required |
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Event |
|
|
Time |
|
Date |
|
|
Equipment Downtime |
|
|
Breakdown Codes |
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Breakdown |
: |
AM |
|
|
|
Due to |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
. |
|
Downtime Cause Code |
|
|||||||
|
Occurred |
|
|
|
|
Maintenance |
|
|
|
|||||||
|
PM |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Maintenance |
: |
AM |
|
|
|
Parts |
|
|
|
|
|
|
|
|
||
|
|
|
|
|
. |
|
|
|
|
|
|
|||||
|
Notified |
PM |
|
|
|
Unavailable |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Returned to |
: |
AM |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other |
|
. |
|
|
|
|
|
|
|||
Operation Status |
|
|
|
|
|
|
|
|
|
|
|
|||||
PM |
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
Time (Amount) |
Maintenance (Signature) |
|
|
|
|
Operations (Signature) |
|||||
|
Mail Processing Time Lost |
|
. |
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Work Order (To be completed by Maintenance)
Description of Work Performed
|
|
|
Work Completed By |
|
|
Date |
|
|
|
|
|
|
|
Parts Issue (Use this section to record parts issues when MARS is unavailable for use.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Part Number |
Nomenclature |
Quantity |
Issued By |
|
Issued To |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Official Disposition (Use this section to verify work completion and closing of the Equipment Breakdown Work Order.) |
|
|
|
|||
|
|
|
|
|
|
|
Maintenance Official Approval (Signature and title) |
|
Date |
Close Work Order (Maint. Ops. Support initials) |
|||
|
|
|
|
|
|
|
PS Form 4805, June 1998 (Reverse)