Follow these steps to access and complete the Annual Facility Site Compliance Inspection report for your Wisconsin stormwater permit:
- Conduct the annual inspection. Walk the facility to assess all stormwater drainage areas, outfall points, BMPs, and potential pollution sources before recording anything on the form.
- Download the form. Use the button at the top of this page to view the 3400-176 PDF. You can view or print it using any standard PDF viewer.
- Record inspection findings. Document the condition of each BMP, any deficiencies identified, and corrective actions planned or completed. Include specific dates and the names of responsible parties.
- Retain the completed form on-site. Wisconsin DNR rules require keeping the AFSCI on file for at least three years. Store it with your Stormwater Pollution Prevention Plan (SWPPP) records for easy access.
- Make it available for regulatory review. Regulators may request the completed form during inspections or permit renewal reviews. Ensure facility staff and compliance personnel know where to find it.
For additional Wisconsin environmental compliance documents, browse our Wisconsin DNR forms collection.
