Nrcc Elc 01 E Form PDF Details

If you're a business looking to apply for an NRCC ELC 01E License form, the process can seem daunting and complex. You may have questions about what you need to include in your application or why this specific type of license is necessary for your company. Fortunately, the information on this blog post provides a detailed overview of the NRCC ELC 01E license form and steps to follow that will make applying easier. With clear instructions pertaining to filling out each section, background information so you understand where it fits into business operations, and tips on how to avoid common mistakes while submitting applications, we'll help you streamline the process saving time and effort along the way!

QuestionAnswer
Form NameNrcc Elc 01 E Form
Form Length6 pages
Fillable?No
Fillable fields0
Avg. time to fill out1 min 30 sec
Other names2013 NRCC ELC 01 E Disaggregation_of_Electrical _Circuits elc 01 form

Form Preview Example

CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance

STATE OF CALIFORNIA

ELECTRICAL POWER DISTRIBUTION

CEC-NRCC-ELC-01-E (REVISED 01/16)

CALIFORNIA ENERGY COMMISSION

 

 

CERTIFICATE OF COMPLIANCE

NRCC-ELC-01-E

 

 

Electrical Power Distribution

(Page 1 of 6)

Project Name:

Date Prepared:

General Information

Project Address:

 

 

 

 

Climate Zone:

 

Conditioned Floor Area:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unconditioned Floor Area:

 

 

 

 

 

 

 

 

Building Type:

Nonresidential

High-Rise Residential

Hotel/Motel

 

Schools

Relocatable Public Schools

 

 

Phase of Construction:

New Construction

Addition

Alteration

In the table below identify all applicable construction documents that specify the requirements for the scope of responsibility reported by this certificate. Use additional pages as needed to list all construction documents related to compliance of Section 130.5.

 

 

 

 

 

 

Indicate which

 

 

 

 

 

 

 

 

subsection of

 

 

 

 

 

 

 

 

 

 

 

 

Document Title / Descriptions

 

 

 

 

Section 130.5 is

 

 

 

 

 

 

 

 

 

 

 

 

Document Sheet #

 

 

related to the

 

 

Document Number

(include description information for Table or

 

 

 

 

 

 

or Page #

 

 

document (e.g.

 

 

 

Schedule if it contains compliance information)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

130.5(a) for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

service electrical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

metering)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

January 2016

STATE OF CALIFORNIA

ELECTRICAL POWER DISTRIBUTION

CEC-NRCC-ELC-01-E (REVISED 01/16)

CALIFORNIA ENERGY COMMISSION

 

 

CERTIFICATE OF COMPLIANCE

NRCC-ELC-01-E

 

 

Electrical Power Distribution

(Page 2 of 6)

Project Name:

Date Prepared:

Document Number

Document Title / Descriptions

(include description information for Table or Schedule if it contains compliance information)

Document Sheet #

or Page #

Applicable

subsection of

Section 130.5

CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance

January 2016

STATE OF CALIFORNIA

ELECTRICAL POWER DISTRIBUTION

CEC-NRCC-ELC-01-E (REVISED 01/16)

CALIFORNIA ENERGY COMMISSION

 

 

CERTIFICATE OF COMPLIANCE

NRCC-ELC-01-E

 

 

Electrical Power Distribution

(Page 3 of 6)

Project Name:

Date Prepared:

A. Service Electrical Metering

Check one of the three boxes below if the electrical power distribution system is in compliance with Section 130.5(a).

For newly installed electrical service in newly constructed buildings, Service Electrical Metering is required according to Section 130.5(a). Fill out Column 1 thru 6 of table below.

For new or replacement electrical service equipment in existing buildings, Service Electrical Metering is required according to Section 141.0(b)2Pi. Fill out Column 1 thru 6 of table below.

EXCEPTION to Electrical Service Metering: Service or feeder for which the utility company provides a metering system that indicates instantaneous kW demand and kWh for a utility-defined period. Fill out Column 1, 2 and 6 of table below with the compliance information.

Fill out a separate line for each electrical service that is connected to the building. If additional table space is needed for electrical service information, submit additional page with the information.

 

Electrical

Electrical Service Schedule

Service

 

Rating

01

02

Electrical Service

 

Designation/Location/Description

kVA

 

Metering Capabilities

 

Exception to

(check all that are present)

130.5(a)

03

 

04

05

06

07

Instantaneous (at the time)

kW

Historical peak (kW)

Tracking kWh for a user- definable period

kWh per rate period

Utility metering system

Field Inspector

08

Check that the

metering complies

CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance

January 2016

STATE OF CALIFORNIA

ELECTRICAL POWER DISTRIBUTION

CEC-NRCC-ELC-01-E (REVISED 01/16)

CALIFORNIA ENERGY COMMISSION

 

 

CERTIFICATE OF COMPLIANCE

NRCC-ELC-01-E

 

 

Electrical Power Distribution

(Page 4 of 6)

Project Name:

Date Prepared:

B. Separation of Electrical Circuits for Electrical Energy Monitoring

Check all boxes below if the electrical power distribution system is in compliance with Section 130.5(b).

The electrical power distribution system meets the separation of electrical circuits for electrical energy monitoring requirement of Section 130.5(b). The electrical power distribution systems is designed so that measurement devices can monitor the electrical energy usage of load types according to TABLE 130.5-B.

Describe the electrical power distribution system installed and the compliance method chosen in meeting the requirement of Section 130.5(b). Use the space below to include the information. Examples of compliance methods are detailed in Nonresidential Compliance Manual Chapter 8.

Fill out Column 1 thru 3 with the compliance information.

General information

Electrical Power Distribution System information and Method of

Electrical Service

Enforcement

compliance

Rating

Agency

 

 

 

 

 

01

02

03

04

 

 

 

 

Electrical Service

Describe the electrical power distribution system installed and the

 

Check that the

Designation/Location/Descrip

kVA

compliance method used.

system complies

tion

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Field Inspector Notes:

CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance

January 2016

STATE OF CALIFORNIA

ELECTRICAL POWER DISTRIBUTION

CEC-NRCC-ELC-01-E (REVISED 01/16)

CALIFORNIA ENERGY COMMISSION

 

 

CERTIFICATE OF COMPLIANCE

NRCC-ELC-01-E

 

 

Electrical Power Distribution

(Page 5 of 6)

Project Name:

Date Prepared:

C. Voltage Drop

Check all boxes below if the electrical power distribution system is in compliance with Section 130.5(c).

The electrical power distribution system meets the voltage drop requirement of Section 130.5(c). The maximum combined voltage drop on feeder conductors and branch circuit conductors to the farthest connected load or outlet, do not exceed 5%.

Voltage drop calculation documents showing compliance to Section 130.5(c) are submitted as part of the compliance document submittal.

Enforcement Agency

Check that the system

complies

D. Circuit Controls for 120-Volt Receptacles and Controlled Receptacles

Field Inspector

Check one or more boxes below for applicable requirements of Section 130.5(d) for the electrical power distribution

Cehck that the system

system.

complies

 

 

The control is capable of automatically shutting OFF the controlled receptacles when the space is typically

 

unoccupied, either at the receptacle or circuit level. For the automatic time switch control, it incorporates an

 

override control that allows the controlled receptacle to remain ON for no more than 2 hours when an override

is initiated and an automatic holiday “shut-OFF” feature that turns OFF all loads for at least 24 hours and then

 

resumes the normally scheduled operation. Countdown timer switches are not be used to comply with the

 

automatic time switch control requirements. The controls meet the requirement of Section 130.5(d)1.

 

 

 

There is at least one controlled receptacle within 6 ft from each uncontrolled receptacle. Where receptacles are

 

installed in modular furniture in open office area, at least one controlled receptacle is installed at each

workstation. The receptacles meet the requirement of Section 130.5(d)2.

 

 

 

There are installed split wired receptacles with at least one controlled and one uncontrolled receptacle. Where

 

receptacles are installed in modular furniture in open office area, at least one controlled receptacle is installed

at each workstation. The receptacles meet the requirement of Section 130.5(d)2.

 

 

 

Permanent and durable marking for controlled receptacles or circuits to differentiate them from uncontrolled

receptacles or circuits is provided. The markings meet the requirement of Section 130.5(d)3.

 

 

 

For hotel and motel guest rooms, there are controlled receptacles for at least one-half of the 120-volt

 

receptacles in each guest room. Electric circuits serving controlled receptacles in guestrooms are installed to

 

have captive key controls, occupancy sensing controls, or automatic controls so the power is switched off no

longer than 30 minutes after the guest room has been vacated. The receptacles meet the requirement of

 

Section 130.5(d)4.

 

 

 

Receptacles that are only for the following purposes are excepted from Section 130.5(d):

 

-Receptacles specifically for refrigerators and water dispensers in kitchen areas.

 

-Receptacles located a minimum of six ft above the floor that are specifically for clocks.

 

-Receptacles for network copiers, fax machines, A/V and data equipment other than personal computers in

 

copy rooms.

-Receptacles on circuits rated more than 20 amperes.

 

-Receptacles connected to an uninterruptible power supply (UPS) that are intended to be in continuous use, 24

 

hours per day/365 days per year, and are marked to differentiate them from other uncontrolled

 

receptacles or circuits.

 

 

 

CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance

January 2016

STATE OF CALIFORNIA

ELECTRICAL POWER DISTRIBUTION

CEC-NRCC-ELC-01-E (REVISED 01/16)

CALIFORNIA ENERGY COMMISSION

 

 

CERTIFICATE OF COMPLIANCE

NRCC-ELC-01-E

 

 

Electrical Power Distribution

(Page 6 of 6)

Project Name:

Date Prepared:

DOCUMENTATION AUTHOR’S DECLARATION STATEMENT

1.I certify that this Certificate of Compliance documentation is accurate and complete.

Documentation Author Name:

Documentation Author Signature:

Company:

Signature Date:

Address:

CEA/ HERS Certification Identification (if applicable):

City/State/Zip:

Phone:

RESPONSIBLE PERSON'S DECLARATION STATEMENT

I certify the following under penalty of perjury, under the laws of the State of California:

1.The information provided on this Certificate of Compliance is true and correct.

2.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer).

3.The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.

4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.

5.I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.

Responsible Designer Name:

Responsible Designer Signature:

Company :

Date Signed:

Address:

License:

City/State/Zip:

Phone:

CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance

January 2016