Form Cec Nrci Mch 01 E PDF Details

The California Energy Commission's CEC-NRCI-MCH-01-E form, revised in January 2016, serves as a crucial document for compliance with the state's energy efficiency standards specifically for mechanical installations. Designed for application across nonresidential buildings, high-rise residential structures, and hotels/motels, this form captures a comprehensive set of data points. It documents the general information about the project including details like the project name, permit number, project address, and importantly, the phase of construction—whether it's new construction, an addition, or an alteration. Further, it necessitates declarations from documentation authors and responsible builders or installers attesting to the accuracy, completeness, and compliance of the mechanical installation to applicable codes, regulations, and specifically approved plans and specifications. This form outlines a structured approach to ensure that mechanical installations in buildings conform to the California Building Energy Efficiency Standards enforced since January 2016. Moreover, the form includes detailed instructions for its users on how to fill out each section accurately, ensuring that all installations are up to code and contributing to California’s long-standing commitment to energy efficiency and sustainability in building designs.

QuestionAnswer
Form NameForm Cec Nrci Mch 01 E
Form Length3 pages
Fillable?No
Fillable fields0
Avg. time to fill out45 sec
Other namesca nrcie mechanical, nrcc mch 01 e, nrcc mch 01 e form, mch 01 e form

How to Fill Out Form CEC-NRCI-MCH-01-E

Form CEC-NRCI-MCH-01-E at a glance

What it is: CEC-NRCI-MCH-01-E (Revised 01/16) is the California Energy Commission's Certificate of Installation, NRCI-MCH-01-E Mechanical, with a table of the construction documents for the scope of responsibility.

Who signs: If more than one person has responsibility for building construction, each person shall prepare and sign an Installation Certificate document applicable to the portion of construction for which they are responsible; alternatively, the person with chief responsibility for construction shall prepare and sign the Installation Certificate document(s) for the entire construction.

A filled-in Form CEC-NRCI-MCH-01-E example: an installer certifies a new building

Form CEC-NRCI-MCH-01-E example filled out, example: an installer certifies a new building
Sam Sample, an installer, completes Form NRCI-MCH-01-E for a new building. Nonresidential and New Construction apply, so the other building type and phase of construction boxes stay empty. The picture shows the filled form; its names and figures are sample values. The enforcement agency approved the Certificate of Compliance on 02-20-2026, before the permit date. Only one construction document applies, so the other table rows stay empty. Nothing goes in CEA/ HERS Certification Identification because the author holds none. Sam Sample is both the documentation author and the responsible installer.

How to fill out Form CEC-NRCI-MCH-01-E, box by box

General information: project, agency and permit

Form CEC-NRCI-MCH-01-E example filled out, general information: project, agency and permit

Enter the Project Name, Enforcement Agency and Permit Number, then the Project Address, City and Zip Code.

Enter the date on the building permit.

Building type

Form CEC-NRCI-MCH-01-E example filled out, building type

Indicate the appropriate building type: Nonresidential, High-Rise Residential or Hotel/Motel.

Phase of construction

Form CEC-NRCI-MCH-01-E example filled out, phase of construction

Indicate the appropriate phase of construction: New Construction, Addition or Alteration.

Scope of responsibility and construction documents

Form CEC-NRCI-MCH-01-E example filled out, scope of responsibility and construction documents

Enter the date the enforcement agency approved the Certificate of Compliance (NRCC-MCH-XX) that is used as the basis of the specifications used to demonstrate compliance.

In the table, identify all applicable construction documents that specify the features, materials, components, manufactured devices, or system performance diagnostic results required for the scope of responsibility for this Installation Certificate.

Enter the construction document that specifies the installed feature, material, component, manufactured device or system performance diagnostic results required for compliance as specified on the certificate of compliance.

For each document, enter its Document Title or Description, Applicable Sheets or Pages, Tables, Schedules, etc. and Date Approved By the Enforcement Agency.

As needed, this row shall be filled according to the instructions for row B.02

Documentation author's declaration

Form CEC-NRCI-MCH-01-E example filled out, documentation author's declaration

By signing, the Documentation Author certifies that this Certificate of Installation documentation is accurate and complete.

Enter the Documentation Author Name, Documentation Author Company Name, Address, City/State/Zip, Phone and CEA/ HERS Certification Identification (If applicable); then sign as Documentation Author Signature and enter the Date Signed.

Responsible person's declaration

Form CEC-NRCI-MCH-01-E example filled out, responsible person's declaration

By signing, you certify the following under penalty of perjury, under the laws of the State of California: the information provided on this Certificate of Installation is true and correct.

I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/installer.

The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency.

I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or installation have been met.

I will ensure that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.

Enter the Responsible Builder/Installer Name, Company Name (Installing Subcontractor or General Contractor or Builder/Owner), Address, City/State/Zip, Position With Company (Title), CSLB License and Phone; then sign as Responsible Builder/Installer Signature and enter the Date Signed.

Common questions about Form CEC-NRCI-MCH-01-E

What is nrci mch 01 e?

CEC-NRCI-MCH-01-E (Revised 01/16) is the California Energy Commission's Certificate of Installation, NRCI-MCH-01-E Mechanical, with a table of the construction documents for the scope of responsibility. I understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.

Sources

[1] Form CEC-NRCI-MCH-01-E (Revised 01/16), Certificate of Installation, Mechanical, California Energy Commission (the Official source link on this page).