Form CEC-NRCI-MCH-01-E at a glance
What it is: CEC-NRCI-MCH-01-E (Revised 01/16) is the California Energy Commission's Certificate of Installation, NRCI-MCH-01-E Mechanical, with a table of the construction documents for the scope of responsibility.
Who signs: If more than one person has responsibility for building construction, each person shall prepare and sign an Installation Certificate document applicable to the portion of construction for which they are responsible; alternatively, the person with chief responsibility for construction shall prepare and sign the Installation Certificate document(s) for the entire construction.
A filled-in Form CEC-NRCI-MCH-01-E example: an installer certifies a new building

How to fill out Form CEC-NRCI-MCH-01-E, box by box
General information: project, agency and permit
Building type
Phase of construction
Scope of responsibility and construction documents

Enter the date the enforcement agency approved the Certificate of Compliance (NRCC-MCH-XX) that is used as the basis of the specifications used to demonstrate compliance.
In the table, identify all applicable construction documents that specify the features, materials, components, manufactured devices, or system performance diagnostic results required for the scope of responsibility for this Installation Certificate.
Enter the construction document that specifies the installed feature, material, component, manufactured device or system performance diagnostic results required for compliance as specified on the certificate of compliance.
For each document, enter its Document Title or Description, Applicable Sheets or Pages, Tables, Schedules, etc. and Date Approved By the Enforcement Agency.
As needed, this row shall be filled according to the instructions for row B.02
Responsible person's declaration

By signing, you certify the following under penalty of perjury, under the laws of the State of California: the information provided on this Certificate of Installation is true and correct.
I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/installer.
The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency.
I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or installation have been met.
I will ensure that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.
Enter the Responsible Builder/Installer Name, Company Name (Installing Subcontractor or General Contractor or Builder/Owner), Address, City/State/Zip, Position With Company (Title), CSLB License and Phone; then sign as Responsible Builder/Installer Signature and enter the Date Signed.
Common questions about Form CEC-NRCI-MCH-01-E
What is nrci mch 01 e?
CEC-NRCI-MCH-01-E (Revised 01/16) is the California Energy Commission's Certificate of Installation, NRCI-MCH-01-E Mechanical, with a table of the construction documents for the scope of responsibility. I understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.