In the realm of managing and overseeing construction projects, particularly those involving public infrastructure, ensuring the protection of assets and property rights is paramount. The SCDOT 800 01 form serves a critical role in this process. It is a document aimed at formalizing the agreement between property owners, contractors, and the Department of Transportation. Specifically, it comes into play when there is a need to move buildings, fences, signs, or other obstructions from the right-of-way areas acquired or designated for construction projects. By signing this form, property owners affirm that they have inspected the affected items after their relocation and acknowledge the condition of these items to be equal to or better than their state prior to the move. Furthermore, this form acts as a release, absolving the contractor and the Department of Transportation from further responsibilities or liabilities related to the moved items. Incorporating signatures from the involved parties—owner, contractor's representative, and a witness—this document underscores the mutual satisfaction with the work conducted and the compliance with agreed-upon terms, ensuring no further work, payment, or consideration is expected. It highlights the transparent and responsible approach adopted by stakeholders to mitigate potential disputes and foster trust in public infrastructure projects.
Question | Answer |
---|---|
Form Name | Scdot Form 800 01 |
Form Length | 1 pages |
Fillable? | No |
Fillable fields | 0 |
Avg. time to fill out | 15 sec |
Other names | 800_01 agreement for moving items release scdot form |
Irup#;33134#
Xqltxh#LG=#
Vwdwxv=#
DJUHHPHQW#IRU#PRYLQJ#
LWHPV#UHOHDVH#
Iloh#Qr=# |
Surmhfw#Qr=# |
WKH#VWDWH#RI#VRXWK#FDUROLQD#
FRXQW\#RI#
Urdg#Qr=# Urdg#Lqir=#
DJUHHPHQW#
ZKHUHDV/#
has moved, or caused to be moved, certain buildings, fences, signs, or other obstructions from the
DQG/#ZKHUHDV/#L/#
, have personally inspected said
which has/have been moved and find the condition of the said
to be equal or better than the condition before moving, I, as owner, do hereby release and bind my heirs, executors, administrators, and assigns to release the contractor, , who moved the said , and the DEPARTMENT OF TRANSPORTATION from any further work or responsibility in
connection with the above mentioned work.
LQ#ZLWQHVV#ZKHUHRI/ I have hereunto set my hand and seal this
_____ day of _________________ , in the year of our Lord, __________________
Owner’s Signature
_______________________________________ (L.S.)
Landowner’s Signature
_______________________________________ (L.S.)
In the presence of:
_________________________________
Contractor’s Representative
_________________________________
Witness
File Reference
This agreement is intended to cover Item Nos. This is to certify that I have personally inspected the above moving item or items and find that the moving has been done and all work incident thereto has been satisfactorily completed. I have also contacted the property owner or his/her authorized agent who states that they have signed this agreement without any reservations, they are completely satisfied with the work and condition of the item moved and expect
no further work, payment, or other consideration from the contractor or Department.
Resident Engineer:
Vljqdwxuh=#bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb# Gdwh=#bbbbbbbbbbbbbbbbbbbbbb#
;33134#Sj#4#