Concrete Checklist From PDF Details

When overseeing a construction project, ensuring every detail is checked can be an overwhelming task, especially on the bustling site of a concrete pour. The Concrete Checklist Form serves as an essential tool, designed to assist supervisors and contractors in managing the complexities of concrete work. It acts as a succinct guide, closely aligned with the project specifications, to facilitate thorough inspections on-site. The checklist highlights key aspects such as formwork, reinforcing steel, concrete delivery, and placement, alongside required tests and inspections, making it easier to spot potential issues in materials, workmanship, and trade coordination. Additionally, it provides space for personalized notes and photographs, enhancing the documentation process which can be invaluable during disputes or for future reference. Its structure encourages the addition of project-specific checks and shared experiences among supervisors, fostering an environment of knowledge exchange and support. With the checklist, supervisors are reminded to take photocopies and study relevant sections before site visits, ensuring preparedness and efficiency in monitoring. The emphasis on detailed checks, complete with sign-off procedures, ensures that every concrete pour is executed to the highest standards, minimizing future complications. This foundational document not only aids in immediate oversight but also in the continuous improvement of project management protocols, inviting suggestions for enhancements from professionals in the field.

QuestionAnswer
Form NameConcrete Checklist From
Form Length4 pages
Fillable?No
Fillable fields0
Avg. time to fill out1 min
Other namespre pour sign off sheet, concrete pour checklist pdf, concrete pouring request sample, concrete slab inspection checklist

Form Preview Example

project check lists concrete pour

use in conjunction with the specification for the subject project

INTRODUCTION

It is difficult during a visit to a construction site to memorise all of the details that need to be checked and while the obvious ones stand out, many other items that should be checked are forgotten. Supervisors may get distracted or over extended due to time constraints and overlook items that may have more serious consequences later in the project.

These Check Lists provide a guide to the inspections that are required on site for a particular project. They are a précis of the full clauses in the project specification and can be referred back to the specification if the full text of the particular item is required. The Check Lists will remind you of virtually every potential problem in materials, workmanship and coordination between trades.

The Check Lists include a list of the Hold Points, Witness Points and Tests that are required to be signed off by the Supervisor on projects that include the Project Control section. The rest of the checks are simply dot points to jog the memory of the Supervisor.

Project specific checks may be added to the Check Lists for individual projects and the experience of Supervisors can be shared by the addition of particular checks on items or operations that are generally of concern on site. In this case less experienced Supervisors can use these Check Lists to provide them with the back up of more experienced officers.

Provide one copy of the Check Lists book to the Supervisor and one copy to the Contractor for the particular project.

HOW TO USE THESE CHECK LISTS

Take photocopies of the relevant Check List sections before going on site and study these. This book of Check Lists is spiral bound to allow pages to be photocopied easily.

Mark any items in the Check List that are of particular concern.

At the project site, check off the work against the Check Lists and make notes of any action required in the space provided.

When the work is completed and the final check has been made sign off and date in the box provided. There is also space to provide comments.

Keep a record of all of the completed Check Lists for future reference if required. These could prove to be valuable if disputes arise on the project.

There is no better way to document actual site conditions or details than by photographs, so don’t forget to take a digital camera on site and take images to go with particular items in the Check lists.

FURTHER DEVELOPMENT

If you have any suggestions to improve on these Check Lists or the system in general please contact Lawrie Foscaro, Manager, Specification Services, 3rd Floor Highway House, Palmerston. Tel; 8946 5021 or email DocumentationServices.DoI@nt.gov.au.

Doc ID

Version

Issued

Printed

Page

1.04–PCL CONCRETE POUR

2016.03

Sept 2016

19/09/2016

2 of 4

Comments from in-house staff, consultants or contractors are most welcome.

CONCRETE POUR CHECKLIST

Project/Job Name:

Contract No:

Audit Date:

Contractor:

Concrete Supplier:

Mix Design Approved/Not Approved

 

Audit Item

Y

N

Comments

 

1. Preliminary

 

 

 

Description

 

 

 

Lot Number/s

 

 

 

Previous Lots Conform

 

 

 

Casting Program Accepted

 

 

 

 

 

 

 

 

Curing Method

 

 

 

 

(Stream) (Water) (Fog) (Other)

 

 

 

2. Formwork and Falsework

• Formwork Dimensions in Accordance with Design, including void lengths

• Forms Clean, Smooth and Watertight and Free

of Deleterious/Extraneous/Foreign Materials

• Formwork within Dimension Tolerances

• Forms Meet Line and Level Requirements

3. Reinforcing Steel

• Steel Located/Fixed in Accordance with Drawings

• Reinforcing Clean and Free of Deleterious

Materials

• Critical Cover of 30mm Checked at all locations

• All Splices to Reinforcement at Approved Locations

• All Welds in Accordance with Australian Standards and RFT

4. Concrete Inclusions

• Embedded Dowels, Bolts, Conduits and Ducts

• Cored Holes, Weepholes, Block Outs, transverse stressing holes

• Lifting/Carrying Lugs etc

• Located as Shown on Drawings

Audit Results and Comments

Signature:

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Doc ID

Version

 

Issued

Printed

Page

 

1.04–PCL CONCRETE POUR

2016.03

Sept 2016

19/09/2016

3 of 4

 

 

Audit Item

Y

N

Comments

 

 

5. Concrete Delivery

 

 

 

 

Number of Batches

 

 

 

 

• Batch Time (From Delivery Docket)

 

1.

2.

3.

• Arrival Time at Site

 

1.

2.

3.

Finish Time

 

1.

2.

3.

 

6. Concrete Testing

 

 

 

NATA Approved Testing Authority

Name:

 

 

• Ambient Temperature (Between 5oC and 35oC)

 

 

 

Actual Concrete Temperature

1.

2.

3.

Target Slump 50 mm ± 10mm. Actual Slump

1.

 

 

 

 

2.

 

 

 

 

3.

 

 

Amount of Admixture added

1.

2.

3.

Amount of water added

1.

2.

3.

• Number of Cylinders Taken

 

 

 

Target Strength

 

 

 

7. Concrete Placement

• Placement Method (Pump, Tremie, Chute,

Other)

• Sufficient Personnel for Finishing etc.

• Approved Vibration Method

• Back up Vibrators on Hand

• Reinforcement Cover Maintained During Pour

• Formwork Stable During Placing and Vibration

• Concrete Placed and Compacted Within: 25oC – 28oC = 75mins

28oC – 32oC = 60 mins 32oC – 35oC = 45 mins

• Provision for Closure of Access/Openings

• Forms Free of Foreign Matter Prior to Pouring

• Concrete Finished to Approved Tolerances

Audit Results and Comments

Signature:

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Doc ID

Version

 

Issued

Printed

Page

 

1.04–PCL CONCRETE POUR

2016.03

Sept 2016

19/09/2016

4 of 4

 

How to Edit Concrete Checklist From Online for Free

Filling out the concrete pouring request form is easy with our PDF editor. Follow these steps to prepare the document right away.

Step 1: Hit the button "Get form here" to access it.

Step 2: As soon as you've entered the editing page concrete pouring request, you'll be able to see all the actions intended for the file in the upper menu.

The following segments are within the PDF template you will be filling out.

completing concrete pre pour inspection checklist stage 1

The program will demand you to fill out the Standards and RFT, Concrete Inclusions Embedded, transverse stressing holes, LiftingCarrying Lugs etc Located, Audit Results and Comments, Signature, Date, Doc ID PCL Concrete Pour, Version, Issued Sept, Printed, and Page of section.

stage 2 to filling out concrete pre pour inspection checklist

The application will ask you for information to quickly fill up the part Comments, Name, Audit Item Concrete Delivery, Number of Batches Batch Time, Concrete Testing, NATA Approved Testing Authority, Amount of Admixture added Amount, Concrete Placement, Placement Method Pump Tremie Chute, Other, and Sufficient Personnel for.

Entering details in concrete pre pour inspection checklist part 3

You have to indicate the rights and obligations of each party in space Sufficient Personnel for, oC oC mins oC oC mins oC oC, Provision for Closure of, Audit Results and Comments, Signature, and Date.

Finishing concrete pre pour inspection checklist part 4

Step 3: Select "Done". You can now transfer your PDF document.

Step 4: To protect yourself from any type of issues down the road, try to create minimally a couple of copies of your form.

Watch Concrete Checklist From Video Instruction

Please rate Concrete Checklist From

1 Votes
If you believe this page is infringing on your copyright, please familiarize yourself with and follow our DMCA notice and takedown process - click here to proceed .