Form BPP-5 PDF Details

To Issue Construction Permit for the Builders Pavement Plan Work.

Project: BPP #, BIS #, Permit #, Project Lead Address, Block, Lot, Owner's Name, Telephone Number, E-mail Address.

Street lines: Street Number 1, Between (Provide cross streets), New Curb, New Concrete Walk, New Roadway Pavement, Linear Feet.

Signatures: Professionals Signature, Date, Department of Buildings Representative, Date.

QuestionAnswer
Form NameForm BPP-5
Form Length1 page
Fillable?Yes
Fillable fields42
Avg. time to fill out7 min
Edition12/14
Submitted byA registered architect, registered landscape architect or licensed engineer
SignaturesProfessionals Signature and Department of Buildings Representative
Matches the agency's fileYes, checked October 1, 2026
Other namesBPP-5, BPP5, BPP 5, BPP form, Builders Pavement Plan
Official sourceForm BPP-5 (Rev 12/14),

How to Fill Out Form BPP-5

Form BPP-5 at a glance

What it is: Form BPP-5 (Rev. 12/14), Builders Pavement Plan: Authorization to the Department of Transportation to Issue Construction Permit for the Builders Pavement Plan Work.

Who signs: A registered architect, registered landscape architect or licensed engineer is required to submit form. The form has Street Number 1, Street Number 2 and Street Number 3.

A filled-in Form BPP-5 example: an architect lists New Curb, New Concrete Walk and New Roadway Pavement work on one street

Form BPP-5 example filled out, example: an architect lists New Curb, New Concrete Walk and New Roadway Pavement work on one street
An architect fills out the Builders Pavement Plan authorization form. The work covers Street Number 1 only, so Street Number 2 and Street Number 3 stay empty. The picture shows a filled form, and every value in it is made up. The Project Lead Address is in BK, so BK is marked. The architect dates the form March 14, 2026, and the Department of Buildings Representative dates it March 20, 2026.

How to fill out Form BPP-5, box by box

BPP #, BIS # and Permit #

Form BPP-5 example filled out, bPP #, BIS # and Permit #

Enter the BPP #, the BIS # and the Permit #.

Project Lead Address, Block and Lot

Form BPP-5 example filled out, project Lead Address, Block and Lot

Enter the Project Lead Address, mark BK, BX, MN, QNS or SI, and enter the Block and the Lot.

Owner's Name, Telephone Number and E-mail Address

Form BPP-5 example filled out, owner's Name, Telephone Number and E-mail Address

Enter the Owner's Name, the Telephone Number and the E-mail Address.

Street Number 1

Form BPP-5 example filled out, street Number 1

Enter Street Number 1, the cross streets Between (Provide cross streets) and, and the New Curb, New Concrete Walk and New Roadway Pavement in Linear Feet. Street Number 2 and Street Number 3 have the same row.

For New Roadway Pavement on Street Number 1, Street Number 2 and Street Number 3, enter the Linear Feet by the Feet wide.

Street Number 2 and Street Number 3

Form BPP-5 example filled out, street Number 2 and Street Number 3

Enter Street Number 2 and Street Number 3 as Street Number 1.

Professionals Signature and Date

Form BPP-5 example filled out, professionals Signature and Date

Sign on the line for the Professionals Signature and enter the Date, after Street Number 1, Street Number 2 and Street Number 3.

Department of Buildings Representative and Date

Form BPP-5 example filled out, department of Buildings Representative and Date

The Department of Buildings Representative signs and enters the Date, after Street Number 1, Street Number 2 and Street Number 3.

More rules for Form BPP-5

Department of Transportation permits include an asphaltic repair strip in the roadway next to the new curb, on Street Number 1, Street Number 2 and Street Number 3.

Sources

[1] Form BPP-5 (Rev. 12/14), Builders Pavement Plan, NYC Department of Buildings and Department of Transportation (the Official source link on this page).