The FP 85 form is an essential document utilized within the plumbing division, specifically focusing on sprinkler inspection reports. It encompasses a comprehensive evaluation of sprinkler systems within a given premises, starting from the date of inspection to intricate details about the system’s installation, operational status, and compliance with approved plans. The form meticulously records various critical aspects, such as the number of stories and area of coverage, construction type, occupancy details, water supply specifications (highlighting whether it's fed by city water, the connection size, and whether it's a wet or dry supply system). Additionally, it covers the specifics regarding the installation and operational integrity of the sprinkler system, such as valve types, water pressure levels, tank capacities, and the condition and functionality of control valves and fire pumps. The document ensures that all emergency systems are operating correctly, detailing the sizes and types of valves, drain systems, and the presence and condition of alarms. The necessity for such thorough documentation underscores the importance of maintaining a high standard of safety and compliance with fire department regulations. The form also includes sections for the owner's and contractor's names and addresses, inspector signatures, and recommendations, thus providing a complete accountability and maintenance blueprint for the sprinkler systems. This meticulous examination and reporting process underscore the commitment to safety and regulatory adherence crucial in safeguarding lives and property against the risk of fire.
Question | Answer |
---|---|
Form Name | Form Fp 85 |
Form Length | 1 pages |
Fillable? | No |
Fillable fields | 0 |
Avg. time to fill out | 15 sec |
Other names | fp85 form, fp85, new york fp 85, form fp 85 form form |
Plumbing Division
Sprinkler Inspection Report
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
|
|
|
|
|
|
|
|
||||
|
Premises |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Borough |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
When Installed |
|
|
|
|
|
|
|
|
||||||||||||||||||||||||
|
Approved Plan # |
|
|
|
|
|
|
|
|
|
|
Stories |
|
|
|
|
Feet |
|
|
|
|
|
|
Area |
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||||||||
|
Construction |
|
|
|
|
|
|
|
|
|
|
Occupancy |
|
|
|
|
No. of water supplies |
|
|
|
Wet or Dry |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
Supply: City Water Connection Size |
|
|
|
|
Fed 2 ways |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
Curb or P.I. Valve |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name & size of meter |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||
|
Valves sealed open |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lbs. Pressure |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
Gravity Tank Capacity |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Heated |
|
|
|
|
|
|
|
|
|
Height over top sprinkler line |
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||
|
Size fill line |
|
|
|
|
|
|
|
|
|
|
|
Size Overflow |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Emergency Drain Valve |
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||||
|
Type and Size |
|
|
|
|
|
|
|
|
Tank piping brass |
|
|
|
|
|
|
|
Exposed piping weatherproofed |
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||
|
Ladder secured |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location tank check and control valve |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||||||
|
Valves sealed open |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No. Fill Pumps |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Size |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Type |
|
||||||||||||||||||||||||||
|
Capacity in gallons |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
How operated |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||
|
Pressure Tank Capacity |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tank House Heated |
|
|
|
|
Size Fill Line |
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||||||||
|
Emergency Drain Valve |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Type and Size |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Air Pressure |
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||
|
Water Level |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location tank check and control valves |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||||||
|
Control valves sealed open |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||
|
Risers No. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Size dead risers |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Size live risers |
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||
|
Size drain risers |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Floor control valves |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sealed open |
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||
|
Main Drain |
|
|
|
|
|
|
Size |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location inspectors Test valve |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||
|
Exposed Piping or Heads |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
How protected |
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||
|
No. Cold Weather Valves |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
App’d signs |
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||||||||||
|
No. Dry Valves |
|
|
|
|
|
|
|
|
|
Name |
Type |
Water Pressure |
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Air Pressure |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dry Valve room heated |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||
|
No. of heads controlled by each dry pipe valve |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||
|
No. Alarm Valves |
|
|
|
|
|
|
|
|
|
|
|
|
|
Size and type |
|
|
|
|
|
|
|
|
|
|
Local |
|
|
|
|
|
|
|
|
|
|
Supervisory |
||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Flow Alarm |
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||
|
Fire Pumps: Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Type |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Capacity in Gallons |
||||||||||||||||||||||||||||||
|
Or |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
Booster Pumps: |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Draws from |
|
|
|
|
Size of suction line |
|
|||||||||||||||||||||||||||||||||||||||||||||||||
|
Size of discharge line |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
How operated |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Supervisory |
|
|
|
|
|
|
|
|
|
Adequate pressure in system
No.Siamese connections |
|
|
|
|
|
Size |
|
|
|
|
|
App’d Type |
|
|||||
Location |
|
Signs |
|
|
|
|
Type of drips |
|
||||||||||
Caps painted green |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Is every square foot of the building sprinklered |
|
|
|
|
|
|
|
|
|
|
|
|||||||
If not, portion sprinklered |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Extra heads & wrench provided |
|
|
|
|
|
Painted or corroded heads |
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
||||||||
Is installation as per app’d plan |
|
|
|
|
|
|
As per Fire Dept. order |
|
||||||||||
Entire system tested at 200 p.s.i. |
|
|
|
|
|
|
|
|
Result |
|
||||||||
Certificate of Fitness required |
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Recommendations: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
||||||||||
|
OWNER’S NAME AND ADDRESS |
|
|
|
|
|
|
CONTRACTOR’S NAME AND ADDRESS |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inspector (sign)
Test Listed
By
Report to: Div. Of Fire Prevention, Fire Department
Inspector (print)
B FORM FP 85 (REV. 6/03)