Form SBD-8330 at a glance
What it is: The Soil Evaluation Report of the Wis. Dept. of Safety and Professional Services Division of Safety and Buildings, in accordance with SPS 385, Wis. Adm. Code.
Who signs: Print CST Name, Signature, CST Number, Address, Date Evaluation Conducted and Telephone Number.
What to bring and attach to Form SBD-8330
Attach complete site plan on paper not less than 8 1/2 x 11 inches in size. Plan must include, but not limited to: vertical and horizontal reference point (BM), direction and percent slope, scale or dimensions, north arrow, and location and distance to nearest road.
A filled-in Form SBD-8330 example: a soil tester records one boring

How to fill out Form SBD-8330, box by box
Property Owner and Property Location
Use, Number of bedrooms and Parent material
Boring, Pit and Horizon

Enter Depth to limiting factor in in., Boring # Boring and Ground surface elev. in ft.
For each Horizon enter Depth, Dominant Color, Redox Description, Texture, Structure, Consistence, Boundary, Roots and Pit Soil Application Rate GPD/ft 2.
Enter in in., Munsell, Qu. Sz. Cont. Color, Gr. Sz. Sh., *Eff#1 and *Eff#2; * Effluent #1 = BOD 5 > 30 < 220 mg/L and TSS >30 < 150 mg/L and * Effluent #2 = BOD 5 < 30 mg/L and TSS < 30 mg/L.
More rules for Form SBD-8330
Please print all information.
Sources
[1] Form SBD-8330 (R11/11), Soil Evaluation Report, Wis. Dept. of Safety and Professional Services (the Official source link on this page).




