K Electric New Connection PDF Details

Before you fill in k electric new connection, you will want to learn more in regards to the type of form you will use.

QuestionAnswer
Form NameK Electric New Connection
Form Length3 pages
Fillable?No
Fillable fields0
Avg. time to fill out45 sec
Other namesapplication for k electric in urdu, new meter connection, application for new electricity meter connection, k electric new meter connection charges

Form Preview Example

THE KARACHI ELECTRIC SUPPLY COMPANY LIMITED

Application Form for Electricity Service Connection

UNDER NEPRA ACT 1997 (ACT XL OF 1997)

 



1997

Paste Photograph

Here

Owner’s Name

Owner’s Profile

Father’s/Husband’s Name

/

CNIC Number with Validity



Profession/Occupation

/

Address of Correspondence

Phone Residence

Phone Office

Mobile Number

 



 

Email Address

National Tax No. (If applicable)



GST No. (If applicable)



Contact Person Profile (Optional)

Name of Contact Person

Father’s/Husband’s Name

 

/

 

CNIC Number with validity



 

Phone (any)



 

To be filled by the Owner in CAPITAL LETTERS

(This form is Free of cost, all payments shall be made at KESC's authorized banks only)

THE KARACHI ELECTRIC SUPPLY COMPANY LIMITED

Application Form for Electricity Service Connection

UNDER NEPRA ACT 1997 (ACT XL OF 1997)

 



1997

Connection Details

Address where Connection is required



Existing/Nearest Energy Meter Number

/Ž

Type of Premises

 

Residential

Commercial

Industrial

Agriculture

(Please tick mark)

 

 

 

 

 

 

 

 

 

 

 

 

Type of Connection

Single Phase

Three Phase

Underground Overhead

(Please tick mark)

 



 

 

 

 

 

 

 

 

New Connection

 

Load Extension

 

 

Reinforcement

 



(1 to 3 Phase)

 

 

 

3

1

Nature of Services

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Please tick mark)

 

 

 

 

 

 

 

 

Temporary Connection



Separate/Tapping

 

Change of Meter

 

 

 

Meter

/

Position

 

 

 

 

 

 

 

 

Load & Area Requirement

 

 

Multi Stored Projects

 

Type of Units

Size (Sq.Ft/Yds)

Quantity

Load Required (KW)

Total Load Required

 

/

KW

Flats

 

 

 

 

Flats

 

 

 

 

Flats

 

 

 

 

Shop

 

 

 

 

Shop

 

 

 

 

 

 

 

 

Shop

 

 

 

 

 

 

 

 

Water Pump

 

 

 

 

Others

 

 

 

 

 

 

Bungalow / House / School

/ /

 

Type of Units

 

Size (Sq.Ft/Yds)

/

Quantity

Load Required (KW)

KW

Total Load Required

Agricultural / Farms / Industry / CNG / Petrol Pump & Others / // /

Details

Size (Sq Ft/Yds of Plot

/

Load Required (KW)

KW

Total Load Required

Others

 

To be filled by the Owner in CAPITAL LETTERS

(This form is Free of cost, all payments shall be made at KESC's authorized banks only)

THE KARACHI ELECTRIC SUPPLY COMPANY LIMITED

Application Form for Electricity Service Connection

UNDER NEPRA ACT 1997 (ACT XL OF 1997)

 



1997

 

 

 

Customer’s Declaration

 

 

 

 

I/We full agree to pay the charges as per tariff (which shall be enforced from time to time) and all services related charges including Security Deposit, System development charges and other payments (if any) as per approved terms and conditions. I/We hereby agree to abide by all the rules & regulations of KESC and verify that all details and documents are authentic.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ž ā÷ /

/

 

Ž

 

 

÷ ÷

 

 

 

 

 

÷ ÷

 

 

 

 

 

 

 

 

 

ā

 

 

 

 

÷

÷

 

 

 

 

÷

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Signature of Owner with date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

List of Documents to be submitted with this Application form

1.Copy of CNIC of the owner

2.Passport size photograph of applicant (Residential/Commercial/Agriculture connection)

3.Copy of Registered Ownership documents.

4.Copy of approved building plan (in case of MS Building).

5.Copy of covering letter of approved plan/layout.

6.In case of Kachi Abadies, Affidavit for Kachi Abadi.

7.Copy of Trade License (if applicable).

8.Copy of last paid Energy bill (only in case of extension of load).

9.Authority letter of owner (if applicable).

10.List of machinery/Equipments in case of Industrial cases.

11.Details of Chiller units (in case of Centrally Air-Conditioned Premises).

12.Feasibility Report of Industry (in case of Industrial Consumers).

13.Copy of any other paid utility bill/credit card bill for the address verification in case of (Residential/Commercial/Agriculture connection). In case of industrial connection, company letter head mentioning the name of authorized contact person, his contact details, copy of CNIC with authorized stamp shall be submitted with application

14.Undertaking for Deviation from approved building plan (in case of deviation)

15.All Original documents shall be presented with photocopies at time of submitting the application for verification purpose.

For Submission of Applications please contact us at following Offices

 

 

 

For Industrial, Residential, Commercial &

For Residential, Commercial & Agricultural Connection

Agricultural Connections

 

 

 

 

Civic Center: Ground Floor, KESC Block

T ipu Sultan Center: P #: F-8/23-B, KESC Office JCHS,

 

 

 

Block 7/8, PECHS, T ipu Sultan Rd.

 

 

 

 

 

 

7/8JCHS KESCF-8/23-B

Korangi Centre: Plot No. ST-3, Sector-22,

PECHS

 

 

 

 

Near Jam Sadiq Bridge (KPT Flyover), Korangi Industrial Area, Karachi.

Shah Faisal Center: Shop No. 5 Falaknaz Pride opp.

 

 

 

 

 

 

 

 

Airport Police Station Main Shahrah-e-Faisal Shah Faisal

 

 

SITE Center: E-1,State Avenue near Siemens Chowrangi , SITE Karachi.

Nazimabad Center: KESC Hadi Market Center, IV-C-6, Commercial Area,

Adjacent Abdullah Floor Mill, Naz. # 4, Karachi

 

 

 

 

 

 

 

 

 

 

ā E-1

IV-C-6 KESC

 

 

 

 

4

For information please call us at 118 or write to us at newconnection@kesc.com.pk

NOTE: KESC may, at its option, use the Security deposit for the purpose of self-utilization by KESC from time to time and shall upon discontinuation of electric supply to the consumer adjust/return the Security deposit as the case may be as per applicable NEPRA notification

To be filled by the Owner in CAPITAL LETTERS

(This form is Free of cost, all payments shall be made at KESC's authorized banks only)

Watch K Electric New Connection Video Instruction

Please rate K Electric New Connection

2 Votes
If you believe this page is infringing on your copyright, please familiarize yourself with and follow our DMCA notice and takedown process - click here to proceed .