BO9: DOB Boiler Inspection Report at a glance
What it is: BO9: DOB Boiler Inspection Report. This inspection report must be filed within forty-five (45) days following the inspection date. Only one form per boiler.
Who signs: Authorized Inspector's Statements and Signature Licensed Master Plumbers, Oil Burner Equipment Installers, and High Pressure Boiler Operator's are authorized to perform low pressure boiler inspections only. Indicate name and license number of authorized NYC boiler inspector who performed inspection. Affix seal if inspection was completed by a licensed NYC boiler inspector who performed inspection in space provided at left (to be sealed by Oil Burner Installer or Master Plumber only). Authorized Insurance Companies are not provided with agency assigned seals.[2]
Purpose of this form (5/14 BO9 instructions, page 1): The BO9 form shall be filed at the Department of Buildings (DOB) in order to fulfill the DOB annual boiler inspection requirement set forth in Article 303 of Title 28 of the Administrative Code.[2]
A filled-in BO9: DOB Boiler Inspection Report example: a master plumber's boiler report

How to fill out BO9: DOB Boiler Inspection Report, box by box
Property Information

Property Information Always required. Provide the borough, block, lot, and Building Identification Number of the building where the boiler is located. Provide the house number, and street name of the building where the boiler is located. If applicable, list the special place name associated with the building where the boiler is located, e.g. 2nd Floor Rear, Roof, Sub-basement, etc. Check (X) "Multiple Dwelling", "Commercial", "Mixed Use" or "Other" to indicate the occupancy classification for the building where the boiler is located, include total number of residential units.
If "Other", please indicate in space provided. If the property is fee exempt, check "Real Estate $0.00 tax bill" or "Verification Letter from Department of Finance" to indicate type of proof submitted to verify fee exempt status. Filing Fee Payment Required: Refer to Agency Fee Rule (checked November 1, 2026).[2]
Owner/Representative Information

Owner / Representative Information Always required. Provide contact owner/filing representative name, telephone number and email address. Provide contact owner/filing representative mailing address, city, state, and zip code.[2]
Boiler Device Information

Boiler Device Information Always required. Indicate the date that a licensed authorized boiler inspector completed the inspection of the boiler at the building indicated in section 1. Provide the DOB issued boiler device and serial number.
These numbers can be found on the department's Building Information System, posted on the boiler, or on the DOB issued boiler card.
The numbers are not the boiler's serial number or manufacturer number, it is a specific number provided by the Department of Buildings at the time the boiler was signed off and approved for use. Regarding the boiler inspected, provide: Boiler make and model, Boiler Type ("Hi" or "Lo" Pressure), Pressure per square inch (PSI), BTUs, The location/floor the inspected boiler is located on, Inspection Type (Internal or External)[2]
Boiler Inspection Defect Summary

Boiler Inspection Defect Summary Refer to Annual Boiler Inspection Review List. Boiler Inspector must check only one Inspection Result, No or Yes. Selection No, if no hazardous conditions were detected during inspection.
Can make recommendations for non-hazardous conditions to be corrected by indicating recommendation Codes in Defects Summary. Selection Yes, if hazardous conditions were detected during inspection.
No Hazardous Defects, if there are Recommendations for Non-hazardous conditions to be corrected, indicate in Defect (s) Summary (or) Yes - Hazardous Defects Found (BO13 must be filed within 180 days of insp. date), must indicate defects in Defect (s) Summary
Hazardous code conditions must be noted in Defects Summary and a BO13 must be filed.
The BO13 form must be completed when defects are recorded during an annual inspection to certify that the defects have been corrected.
Defect (s) Summary Hazardous Conditions Using the codes provided. identify the Boiler Part and the Hazardous Conditions for all defects that are required to be fixed in the Defects Summary.
Hazardous Conditions will require an Affirmation of Correction to certify that the hazardous conditions were corrected.
Non-Hazardous Conditions DO NOT require an Affirmation of Correction to certify that the non-hazardous conditions were corrected.[2]
Common questions about BO9: DOB Boiler Inspection Report
Is there a deadline?
The Department of Buildings' Boiler Division must receive this form within 45 days of the inspection date. If the report is not filed prior to deadline, the owner shall be liable for a civil penalty, pursuant to Section 103-01(c) of Subchapter C of Chapter 100 of Title 1 of the Official Compilation of the Rules of the City of New York.
Where do I file it?
Submit completed BO9 form with payment to: Department of Buildings Attention: CFB - Boilers 280 Broadway, 6th Floor New York, New York 10007[2]