In the realm of utility infrastructure management, ensuring the safety and efficiency of water systems is critical. The Pressure Test Report form, developed by the Port St. Lucie Utility System Department (PSLUSD), serves as an essential document for verifying the integrity of newly installed or repaired water, wastewater, and reclaimed water pipelines. It details a comprehensive procedure that starts with the project basics, including the name, number, engineer of record, and the contractor responsible for the project. A hallmark of this process is the inclusion of a precise formula, derived from AWWA C600/C605 standards, that calculates allowable leakage based on the length of pipe, its diameter, and the test pressure applied. This is critical for determining whether the pipeline meets the stringent requirements set forth for safe operation. The form records both the planned and actual leakage, specifying the acceptable limits for a given duration and the actual outcome, thereby offering a clear pass or fail status. It meticulously notes the test's start and end times, situating the examination within a clearly defined timeframe. Additionally, the requirement for signatures from the overseeing engineer guarantees accountability and ensures that all data presented is accurate and verified. Adopted on October 1, 2010, and identified by PSLUSD Document Number 70, this form epitomizes a structured approach towards maintaining the highest standards in utility infrastructure through rigorous testing and documentation.
Question | Answer |
---|---|
Form Name | Pressure Test Report Form |
Form Length | 1 pages |
Fillable? | Yes |
Fillable fields | 40 |
Avg. time to fill out | 8 min 19 sec |
Other names | miami dade pressure test pipe form pdf, pressure testing reports, ballistic pressure testing, water line pressure test forms |
PORT ST. LUCIE UTILITY SYSTEM DEPARTMENT
PRESSURE TEST REPORT
Project Name:
PSLUSD Project Number:
Engineer of Record:
Project Contractor:
Test Date:
Allowable Leakage Formula: (AWWA C600 / C605) |
L= |
S x D x P |
148000
S = Length
Pipe
Feet
D = Pipe
Diameter
Inches
P = Test
Pressure
psi
P
(square root of P)
Allowable
Leakage
1 hour
Allowable
Leakage
2 hours
Total Allowable Leakage
Actual Leakage
Location / Limits of Test:
Water
Wastewater
Failed
Passed
Start Time: |
|
End Time: |
|
|
Engineer |
|
|
|
|
|
Signature |
Date |
||
Effective Date 10/01/2010 |
|
|