Pressure Test Report Form PDF Details

In the realm of utility infrastructure management, ensuring the safety and efficiency of water systems is critical. The Pressure Test Report form, developed by the Port St. Lucie Utility System Department (PSLUSD), serves as an essential document for verifying the integrity of newly installed or repaired water, wastewater, and reclaimed water pipelines. It details a comprehensive procedure that starts with the project basics, including the name, number, engineer of record, and the contractor responsible for the project. A hallmark of this process is the inclusion of a precise formula, derived from AWWA C600/C605 standards, that calculates allowable leakage based on the length of pipe, its diameter, and the test pressure applied. This is critical for determining whether the pipeline meets the stringent requirements set forth for safe operation. The form records both the planned and actual leakage, specifying the acceptable limits for a given duration and the actual outcome, thereby offering a clear pass or fail status. It meticulously notes the test's start and end times, situating the examination within a clearly defined timeframe. Additionally, the requirement for signatures from the overseeing engineer guarantees accountability and ensures that all data presented is accurate and verified. Adopted on October 1, 2010, and identified by PSLUSD Document Number 70, this form epitomizes a structured approach towards maintaining the highest standards in utility infrastructure through rigorous testing and documentation.

QuestionAnswer
Form NamePressure Test Report Form
Form Length1 pages
Fillable?Yes
Fillable fields40
Avg. time to fill out8 min 19 sec
Other namesmiami dade pressure test pipe form pdf, pressure testing reports, ballistic pressure testing, water line pressure test forms

Form Preview Example

PORT ST. LUCIE UTILITY SYSTEM DEPARTMENT

PRESSURE TEST REPORT

Project Name:

PSLUSD Project Number:

Engineer of Record:

Project Contractor:

Test Date:

Allowable Leakage Formula: (AWWA C600 / C605)

L=

S x D x P

148000

S = Length

Pipe

Feet

D = Pipe

Diameter

Inches

P = Test

Pressure

psi

P

(square root of P)

Allowable

Leakage

1 hour

Allowable

Leakage

2 hours

Total Allowable Leakage

Actual Leakage

Location / Limits of Test:

Water

Wastewater

Re-claimed

Failed

Passed

Start Time:

 

End Time:

 

Engineer

 

 

 

 

 

Signature

Date

Effective Date 10/01/2010

 

 

PSLUSD Doc No. 70