DSA 6-PI PDF Details

The completed form must be submitted to the Design Professional in General Responsible Charge, DSA, and the school board.

Sections: complete sections 1, 2, 3, 4 & 5 and provide all required documentation.

Attached pages: enter the number of attached pages; if none, enter zero.

Inspector cards: list all inspection card numbers for which this verified report applies.

Deviations: if there are unresolved deviations, list the DSA 154 Notice of Deviations/Resolution of Deviations numbers and attach copies.

Submit: submit completed form to the DSA Regional Office with construction oversight authority for the project.

QuestionAnswer
Form NameDSA 6-PI
Form Length1 page
Fillable?Yes
Fillable fields39
Avg. time to fill out7 min
EditionRev 10/28/14
Issuing agencyDivision of the State Architect, Department of General Services
Other namesDSA 6-PI, DSA 6PI, DSA6PI, DSA 6 PI, DSA form 6-PI, Project Inspector Verified Report
Official sourceDSA 6-PI (Rev 10/28/14), Division of the State Architect, Department of General Services

How to Fill Out Form DSA 6-PI

Form DSA 6-PI at a glance

What it is: The 6-PI Project Inspector Verified Report is completed by the Project Inspector, in accordance with California Code of Regulations, Title 24, Part 1, Sections 4-336 or 4-240, and Procedure PR 13-01: Construction Oversight Process.

Where and when to file: Submit the completed form to the DSA Regional Office with construction oversight authority for the project. The form shall be submitted to the Design Professional in General Responsible Charge, DSA, and the school board.

A filled-in Form DSA 6-PI example: a project inspector files a final verified report

Form DSA 6-PI example filled out, example: a project inspector files a final verified report
Ana Sample, a project inspector, files a DSA 6-PI at project completion. Her report covers the entire scope, all work is complete and no deviations remain. The picture shows page 1, and all its values are invented. Section 1 is ticked for the entire scope, so the partial scope field in 1. Project inspector is employed for the following project scope stays empty. Section 2 is ticked for the final verified report, so the occupied buildings, the termination date, the suspension date and the DSA request date in 2. Reason for filing this verified report stay empty. The project needs no deferred submittals, so the list in 3. Deferred submittals stays empty. All work is complete, so the incomplete work boxes in 4. Scope of completed work stay empty. No deviations remain, so the list of DSA 154 notices in 5. Deviations as of the date of this report stays empty.

How to fill out Form DSA 6-PI, box by box

School District/Owner, Project Name/School and DSA numbers

Form DSA 6-PI example filled out, school District/Owner, Project Name/School and DSA numbers

Enter the School District/Owner, the Project Name/School, the Date of Report and the Number of Attached Pages (If none, enter zero.)

Enter the DSA File # and the DSA App. #.

At DSA 152: Project Inspector Card #(s), list all inspection card numbers for which this verified report applies.

DSA-approved construction documents are those portions of the construction documents, duly approved by DSA, that contain information related to and affecting the Structural Safety, Fire/Life Safety, and Accessibility portions of the project.

1. Project inspector is employed for the following project scope

Form DSA 6-PI example filled out, 1. Project inspector is employed for the following project scope

In Section 1, the Project Inspector is employed for the project scope (Check applicable box.): Entire scope of the work shown in the DSA-approved construction documents, or Partial scope of the work shown in the DSA-approved construction documents (Briefly describe. Attach additional pages, using form DSA 211: Attachment for Additional Comments/Information, if necessary.)

2. Reason for filing this verified report

Form DSA 6-PI example filled out, 2. Reason for filing this verified report

In Section 2, Reason for filing this verified report (Check applicable box.), check Final Verified Report: Construction of all work, shown in DSA-approved construction documents, is complete.

Check Building(s) Occupied prior to completion of construction of all work shown in the DSA-approved construction documents, and list occupied buildings and date of occupancy (attach additional pages, using form DSA 211, if necessary).

Check Termination of Project Inspector's Services prior to completion of construction of all work shown in the DSA-approved construction documents and provide date of last inspection, or check Construction Work Suspended for more than one month and provide date of last construction activity.

Check DSA Request dated and enter the date.

3. Deferred submittals

Form DSA 6-PI example filled out, 3. Deferred submittals

In Section 3, Deferred Submittals (Check applicable box.), check one of: This project does not require deferred submittals. All deferred submittals are approved by DSA. The following deferred submittals are not approved by DSA (Provide list. Attach additional pages, using form DSA 211, if necessary.)

4. Scope of completed work

Form DSA 6-PI example filled out, 4. Scope of completed work

In Section 4, Scope of Completed Work (Check applicable box.), check All work shown in the DSA-approved construction documents is complete.

Check There is work shown in the DSA-approved construction documents that is not complete and ALL buildings with work shown in the DSA-approved plans are occupied. The incomplete work is (check one or more): Work involving one or more of the buildings - List the buildings and incomplete work by attaching form DSA 211. Work involving the site - List the incomplete work by attaching form DSA 211.

Check There is work shown in the DSA-approved construction documents that is not complete and SOME BUT NOT ALL buildings with work shown in the DSA-approved plans are occupied. The incomplete work is (check one or more): Work involving one or more of the occupied buildings - List the buildings and incomplete work by attaching form DSA 211. Work involving other buildings not occupied - List the buildings by attaching form DSA 211.

5. Deviations as of the date of this report

Form DSA 6-PI example filled out, 5. Deviations as of the date of this report

In Section 5, Deviations as of the date of this report (Check applicable box.), check There are no outstanding or unresolved deviations related to work shown in the DSA-approved construction documents, or There are unresolved deviations related to work shown in the DSA-approved construction documents. They are documented by form DSA 154 Notice of Deviations (provide list of DSA 154: Notice of Deviations/Resolution of Deviations numbers and attach copies).

Sign

Form DSA 6-PI example filled out, sign

"I attest that based on my own personal knowledge (as defined in California Code of Regulations, Title 24, Part 1, Sections 4-336 and 4-214) that, except as marked in Sections 3, 4 and 5, as of the date of this report, the work has been performed and materials have been used and installed, in every material respect, in compliance with the DSA-approved construction documents."

"I declare under penalty of perjury that I prepared this report and that all statements are true."

Under SIGN, add Signature, Date, Print Name and DSA Certification #.

More rules for Form DSA 6-PI

Complete Sections 1, 2, 3, 4 & 5 and provide all required documentation.

Common questions about Form DSA 6-PI

Where do I file it?

Submit completed form to the DSA Regional Office with construction oversight authority for the project. The completed form shall be submitted to the Design Professional in General Responsible Charge, DSA, and the school board.