Have you ever wondered what a Form Dsa 6 C is? If so, you're not alone. A Form Dsa 6 C is a document that is filed with the California Secretary of State's office to create a limited liability company. This document can be used by entrepreneurs who want to start a business in California. The process of creating a limited liability company can be confusing, but this blog post will provide you with all the information you need to get started. So, keep reading for more information on Form Dsa 6 Cs!
Question | Answer |
---|---|
Form Name | Form Dsa 6 C |
Form Length | 1 pages |
Fillable? | No |
Fillable fields | 0 |
Avg. time to fill out | 15 sec |
Other names | DSA_6 C form dsa 6 |
CONTRACTORVERIFIEDREPORT
This form shall be completed by each contractor having a contract with the owner, in accordance with California Code of Regulations, Title 24, Part 1, Sections
School District/Owner: |
|
DSA File #: |
- |
|
|
|
|
|
|
Project Name/School: |
|
DSA App. #: |
- |
|
|
|
|
||
Date of Report: |
Number of Attached Pages: |
DSA 152 Card #(s): |
||
|
(If none, enter zero.) |
|
|
|
Note that |
|
|
||
the construction documents, duly approved by DSA, that contain information related to and |
List all inspection card numbers for which |
|||
affecting the Structural Safety, Fire/Life Safety, and Accessibility portions of the project. |
||||
this verified report applies. |
||||
|
|
|||
|
|
|
|
COMPLETE SECTIONS 1, 2, 3 & 4 AND PROVIDE ALL REQUIRED DOCUMENTATION
1.CONTRACTOR INFORMATION (Enter name and check applicable box.) Name of Contractor (Company/Firm) Submitting this Report:
Operating as general contractor responsible for all work shown in the
Operating as contractor responsible for part of the work shown in the
2. REASON FOR FILING THIS VERIFIED REPORT (Check applicable box.)
Final Verified Report: Construction of all work shown in the
Termination of contract prior to completion of all work in the contract (Provide last date of work):
DSA Request dated:
3.DEFERRED SUBMITTALS (Check applicable box.)
This project does not require deferred submittals within the scope of my contract.
All deferred submittals within the scope of my contract are approved by DSA.
The following deferred submittals, within the scope of my contract, are not approved by DSA (Provide list. Attach additional pages, using form DSA 211, if necessary.):
4. DEVIATIONS AS OF THE DATE OF THIS REPORT (Check applicable box.)
There are no outstanding or unresolved deviation notices pertinent to my contract and related to work shown in the DSA- approved construction documents.
There are unresolved deviation notices pertinent to my contract and related to work shown in the
There is work pertinent to my contract that is not completed in compliance with the
I attest that based on my own personal knowledge (as defined in California Code of Regulations, Title 24, Part 1, Sections
Contractor Signature: |
|
Date: |
|
||
|
|
|
Contractor’s |
||
Print Name: |
|
|
License No.: |
||
|
|
|
|
|
|
Submit completed form to the DSA Regional Office with construction oversight authority for the project.
DSA |
|
Page 1 of 1 |
DIVISION OF THE STATE ARCHITECT |
DEPARTMENT OF GENERAL SERVICES |
STATE OF CALIFORNIA |