Form TCEQ-10054 at a glance
What it is: Technical Report 1.0 of the Texas Commission on Environmental Quality Domestic Wastewater Permit Application.
A filled-in Form TCEQ-10054 example: a city lists the flows of a new plant

How to fill out Form TCEQ-10054, box by box
Design Flow, 2-Hr Peak Flow, construction and waste disposal start date

Under A. Existing/Interim I Phase, enter the Design Flow (MGD), the 2-Hr Peak Flow (MGD), the Estimated construction start date and the Estimated waste disposal start date.
Under B. Interim II Phase, enter the Design Flow (MGD), the 2-Hr Peak Flow (MGD), the Estimated construction start date and the Estimated waste disposal start date.
Under C. Final Phase, enter the Design Flow (MGD), the 2-Hr Peak Flow (MGD), the Estimated construction start date and the Estimated waste disposal start date.
Under D. Current Operating Phase, provide the startup date of the facility.
More rules for Form TCEQ-10054
The following information is required for all renewal, new, and amendment applications.
For any questions about this form, please contact the Domestic Wastewater Permitting Team at 512-239-4671.
Provide a detailed description of the treatment process. Include the type of treatment plant, mode of operation, and all treatment units. Start with the plant's head works and finish with the point of discharge. Include all sludge processing and drying units.
If more than one phase exists or is proposed, a description of each phase must be provided.
In Table 1.0(1), provide the treatment unit type, the number of units, and dimensions (length, width, depth) of each treatment unit, accounting for all phases of operation.
Provide flow diagrams for the existing facilities and each proposed phase of construction.
Provide the TPDES discharge outfall latitude and longitude. Enter N/A if not applicable.
Provide the TLAP disposal site latitude and longitude. Enter N/A if not applicable.
Provide a site drawing for the facility that shows the following: The boundaries of the treatment facility; The boundaries of the area served by the treatment facility; If land disposal of effluent, the boundaries of the disposal site and all storage/holding ponds; and If sludge disposal is authorized in the permit, the boundaries of the land application or disposal site.
Provide the name and a description of the area served by the treatment facility.
Collection System Information for wastewater TPDES permits only: Provide information for each uniquely owned collection system, existing and new, served by this facility, including satellite collection systems. Please see the instructions for a detailed explanation and examples. Provide the Collection System Name, Owner Name, Owner Type and Population Served.
Is the application for a renewal of a permit that contains an unbuilt phase or phases? Yes or No.
If yes, does the existing permit contain a phase that has not been constructed within five years of being authorized by the TCEQ? Yes or No.
If yes, provide a detailed discussion regarding the continued need for the unbuilt phase. Failure to provide sufficient justification may result in the Executive Director recommending denial of the unbuilt phase or phases.
Have any treatment units been taken out of service permanently, or will any units be taken out of service in the next five years? Yes or No.
If yes, was a closure plan submitted to the TCEQ? Yes or No.
If yes, provide a brief description of the closure and the date of plan approval.
For applicants with an existing permit, check the Other Requirements or Special Provisions of the permit. Have plans and specifications been approved for the existing facilities and each proposed phase? Yes or No. If yes, provide the date(s) of approval for each phase.
Provide information, including dates, on any actions taken to meet a requirement or provision pertaining to the submission of a summary transmittal letter. Provide a copy of an approval letter from the TCEQ, if applicable.
Have the buffer zone requirements been met? Yes or No.
Provide information, including dates, on any actions taken to meet the conditions of the buffer zone. If available, provide any new documentation relevant to maintaining the buffer zones.
Does the Other Requirements or Special Provisions section in the existing permit require submission of any other information or other required actions? Examples include Notification of Completion, progress reports, soil monitoring data, etc. Yes or No.
If yes, provide information on the status of any actions taken to meet the conditions of an Other Requirement or Special Provision.
Does the facility have a design flow of 1.0 MGD or greater in any phase? Yes or No. Does the facility have an approved pretreatment program, under 40 CFR Part 403? Yes or No. If no to both, then skip to Subsection F.
Is the facility in operation? Yes or No. If no, this section is not applicable. Proceed to Section 8.
If yes, provide effluent analysis data for the listed pollutants. Wastewater treatment facilities complete Table 1.0(2). Water treatment facilities discharging filter backwash water, complete Table 1.0(3). Provide copies of the laboratory results sheets. Note: The sample date must be within 1 year of application submission.
Sources
[1] Form TCEQ-10054 (10/17/2024), Domestic Wastewater Permit Application Technical Report 1.0, Texas Commission on Environmental Quality (the Official source link on this page).