Tceq 10054 Form PDF Details

In navigating the complexities associated with managing domestic wastewater, individuals and entities must familiarize themselves with a myriad of regulatory requirements, one of which is the completion and submission of the TCEQ Form 10054, also known as the Domestic Wastewater Permit Application Domestic Technical Report. This form serves as a comprehensive document required for the application, renewal, and amendment of wastewater permits, calling for detailed descriptions of permitted and/or proposed wastewater flows, treatment units, and pollutant analysis of treated effluent, alongside sludge management and disposal methods. It meticulously outlines the necessity for providing flow diagrams, the startup date of current treatment facilities, and whether plans and specifications for existing or proposed facilities have been approved. Additionally, the form delves into the specifics of facility operation including the requirement for certification numbers for operators, sludge disposal methods, and authorization for land application of sewage sludge for beneficial use. This essential document ensures that all domestic wastewater treatment and disposal practices meet the stringent regulations set forth by the Texas Commission on Environmental Quality (TCEQ), facilitating the protection of public health and the environment.

QuestionAnswer
Form NameTceq 10054 Form
Form Length64 pages
Fillable?Yes
Fillable fields2044
Avg. time to fill out11 min
Other namesform 10054 sewer application tecq, tceq 1054 instructions, TCEQ, tecq 10054 instruction

How to Fill Out Form TCEQ-10054

Form TCEQ-10054 at a glance

What it is: Technical Report 1.0 of the Texas Commission on Environmental Quality Domestic Wastewater Permit Application.

A filled-in Form TCEQ-10054 example: a city lists the flows of a new plant

Form TCEQ-10054 example filled out, example: a city lists the flows of a new plant
A city utility files Technical Report 1.0 for a new plant. It builds the plant in three phases, with design flows of 0.5, 1.0 and 2.0 MGD. The picture shows page 1 only; all its values are invented. Each 2-Hr Peak Flow is four times that phase's design flow. Each phase starts waste disposal six months after construction starts. The startup date of the facility is the Interim I waste disposal start date.

How to fill out Form TCEQ-10054, box by box

Design Flow, 2-Hr Peak Flow, construction and waste disposal start date

Form TCEQ-10054 example filled out, design Flow, 2-Hr Peak Flow, construction and waste disposal start date

Under A. Existing/Interim I Phase, enter the Design Flow (MGD), the 2-Hr Peak Flow (MGD), the Estimated construction start date and the Estimated waste disposal start date.

Under B. Interim II Phase, enter the Design Flow (MGD), the 2-Hr Peak Flow (MGD), the Estimated construction start date and the Estimated waste disposal start date.

Under C. Final Phase, enter the Design Flow (MGD), the 2-Hr Peak Flow (MGD), the Estimated construction start date and the Estimated waste disposal start date.

Under D. Current Operating Phase, provide the startup date of the facility.

More rules for Form TCEQ-10054

The following information is required for all renewal, new, and amendment applications.

For any questions about this form, please contact the Domestic Wastewater Permitting Team at 512-239-4671.

Provide a detailed description of the treatment process. Include the type of treatment plant, mode of operation, and all treatment units. Start with the plant's head works and finish with the point of discharge. Include all sludge processing and drying units.

If more than one phase exists or is proposed, a description of each phase must be provided.

In Table 1.0(1), provide the treatment unit type, the number of units, and dimensions (length, width, depth) of each treatment unit, accounting for all phases of operation.

Provide flow diagrams for the existing facilities and each proposed phase of construction.

Provide the TPDES discharge outfall latitude and longitude. Enter N/A if not applicable.

Provide the TLAP disposal site latitude and longitude. Enter N/A if not applicable.

Provide a site drawing for the facility that shows the following: The boundaries of the treatment facility; The boundaries of the area served by the treatment facility; If land disposal of effluent, the boundaries of the disposal site and all storage/holding ponds; and If sludge disposal is authorized in the permit, the boundaries of the land application or disposal site.

Provide the name and a description of the area served by the treatment facility.

Collection System Information for wastewater TPDES permits only: Provide information for each uniquely owned collection system, existing and new, served by this facility, including satellite collection systems. Please see the instructions for a detailed explanation and examples. Provide the Collection System Name, Owner Name, Owner Type and Population Served.

Is the application for a renewal of a permit that contains an unbuilt phase or phases? Yes or No.

If yes, does the existing permit contain a phase that has not been constructed within five years of being authorized by the TCEQ? Yes or No.

If yes, provide a detailed discussion regarding the continued need for the unbuilt phase. Failure to provide sufficient justification may result in the Executive Director recommending denial of the unbuilt phase or phases.

Have any treatment units been taken out of service permanently, or will any units be taken out of service in the next five years? Yes or No.

If yes, was a closure plan submitted to the TCEQ? Yes or No.

If yes, provide a brief description of the closure and the date of plan approval.

For applicants with an existing permit, check the Other Requirements or Special Provisions of the permit. Have plans and specifications been approved for the existing facilities and each proposed phase? Yes or No. If yes, provide the date(s) of approval for each phase.

Provide information, including dates, on any actions taken to meet a requirement or provision pertaining to the submission of a summary transmittal letter. Provide a copy of an approval letter from the TCEQ, if applicable.

Have the buffer zone requirements been met? Yes or No.

Provide information, including dates, on any actions taken to meet the conditions of the buffer zone. If available, provide any new documentation relevant to maintaining the buffer zones.

Does the Other Requirements or Special Provisions section in the existing permit require submission of any other information or other required actions? Examples include Notification of Completion, progress reports, soil monitoring data, etc. Yes or No.

If yes, provide information on the status of any actions taken to meet the conditions of an Other Requirement or Special Provision.

Does the facility have a design flow of 1.0 MGD or greater in any phase? Yes or No. Does the facility have an approved pretreatment program, under 40 CFR Part 403? Yes or No. If no to both, then skip to Subsection F.

Is the facility in operation? Yes or No. If no, this section is not applicable. Proceed to Section 8.

If yes, provide effluent analysis data for the listed pollutants. Wastewater treatment facilities complete Table 1.0(2). Water treatment facilities discharging filter backwash water, complete Table 1.0(3). Provide copies of the laboratory results sheets. Note: The sample date must be within 1 year of application submission.

Sources

[1] Form TCEQ-10054 (10/17/2024), Domestic Wastewater Permit Application Technical Report 1.0, Texas Commission on Environmental Quality (the Official source link on this page).