Concrete Pour Checklist at a glance
What it is: Project check lists, concrete pour: use in conjunction with the specification for the subject project.
Who signs: The Check Lists include a list of the Hold Points, Witness Points and Tests that are required to be signed off by the Supervisor on projects that include the Project Control section. When the work is completed and the final check has been made sign off and date in the box provided.
Keep a record of all of the completed Check Lists for future reference if required.
A filled-in Concrete Pour Checklist example: a supervisor audits the preliminary items

How to fill out Concrete Pour Checklist, box by box
Preliminary
Formwork and Falsework
Reinforcing Steel

Under Reinforcing Steel, check Critical Cover of 30mm Checked at all locations.
Under Reinforcing Steel, check Steel Located/Fixed in Accordance with Drawings; Reinforcing Clean and Free of Deleterious Materials; All Splices to Reinforcement at Approved Locations; All Welds in Accordance with Australian Standards and RFT.
Concrete Inclusions
Concrete Delivery
Concrete Testing

Under Concrete Testing, check Ambient Temperature (Between 5oC and 35oC).
Under Concrete Testing, the Target Slump is 50 mm ± 10mm, with Actual Slump 1. 2. 3.
Under Concrete Testing, check NATA Approved Testing Authority Name; Actual Concrete Temperature 1. 2. 3.; Amount of Admixture added 1. 2. 3.; Amount of water added 1. 2. 3.; Number of Cylinders Taken; Target Strength; next section 7.
Concrete Placement

Under Concrete Placement, check Concrete Placed and Compacted Within: 25oC - 28oC = 75mins 28oC - 32oC = 60 mins 32oC - 35oC = 45 mins.
Under Concrete Placement, check Placement Method (Pump, Tremie, Chute, Other); Sufficient Personnel for Finishing etc.; Approved Vibration Method; Back up Vibrators on Hand. Also check Reinforcement Cover Maintained During Pour; Formwork Stable During Placing and Vibration; Provision for Closure of Access/Openings; Forms Free of Foreign Matter Prior to Pouring; Concrete Finished to Approved Tolerances; then add Audit Results and Comments, Signature and Date.
More rules for Concrete Pour Checklist
At the project site, check off the work against the Check Lists and make notes of any action required in the space provided.
Mark any items in the Check List that are of particular concern.
When the work is completed and the final check has been made sign off and date in the box provided.
There is also space to provide comments.
Before you go
Provide one copy of the Check Lists book to the Supervisor and one copy to the Contractor for the particular project.
Take photocopies of the relevant Check List sections before going on site and study these.