FAA Form 7460-1 PDF Details

You must submit this form at least 45 days before the start date of the proposed construction or alteration or the date an application for a construction permit is filed, whichever is earliest.

Processing: failure to provide all requested information may delay processing of your notice.

Datum: NAD 83 is preferred; however, latitude and longitude may be submitted in NAD 27.

Hand-held GPS: latitude and longitude derived solely from a hand-held GPS instrument is NOT acceptable.

Other rules: filing this information with the FAA does not relieve the sponsor from complying with any other federal, state or local rules or regulations.

QuestionAnswer
Form NameFAA Form 7460-1
Form Length3 pages
Fillable?Yes
Fillable fields95
Avg. time to fill out16 min
Edition03/25
Issuing agencyFederal Aviation Administration
Matches the agency's fileYes, checked October 2, 2026
Other names7460-1, 74601, FAA 7460-1, FAA Form 7460-1, FAA 7460, Notice of Proposed Construction or Alteration
Official sourceFAA Form 7460-1 (Rev 03/25), Federal Aviation Administration